Elite ProAV EDGE FREE Pro Frame Thin UST Series User Manual Download Page 6

11152019-JA 

www.eliteproav.com

 

 

 

Center Support Bar 

Step 11:

 Insert the 

Center Support 

Bar (i)

 into the upper top groove on 

the back of the frame with the bottom 
end near the approximate center point 
of the frame and rotate it in at an angle 
so that both ends of the bar are in 
alignment with the groove. 

Attention: Do not proceed with the Edge Trim installation until making sure there are no ripples in the material. 

Pre-check prior to Edge Trim Installation 

Correct

:  Distinguish  the  top 

and  bottom  of  the  CLR® 
material.  Place  the  assembled 
screen  on  the  ground.    Look 
down  on  the  screen.  If  the 
material  looks  white/gray  as 
shown below then it is correct.  

 

Incorrect

: If the material looks 

black as shown below, then it is 
upside down. 

 

 

 

 

Edge Trim Installation 

Step 12

: Place the 

Edge Trim

 over each end of the frame and secure with 

M4x6 screws (c)

Start with the center points first, then the rest of the corners as shown below. 

 

 

 

 

 

Summary of Contents for EDGE FREE Pro Frame Thin UST Series

Page 1: ...attention to the following instructions 1 The screen surface has a horizontal lens structure DO NOT wipe the screen up and down or in a circular motion Wipe very gently from left to right only 2 Pleas...

Page 2: ...F Item Parts List 100 120 a Center Joints 4 4 b Elbow Joints 8 8 c M4x6 Screws 60 60 d Spring Hook 2 2 e Spring pre installed 60 68 f Top wall brackets 2 2 g M5x50 Wall Screws 6 6 h Hollow Wall anchor...

Page 3: ...ure to avoid the springs from slipping out of the grooves when you remove the foam Step 4 Insert the center joint a connectors into one half of the horizontal frame b c and secure with the M4x6 screws...

Page 4: ...ully and gently place the assembled frame on top of the screen material Make sure to not allow the angle edge of the frame to come in direct contact with the screen material to avoid puncturing it Not...

Page 5: ...n material are properly wrapped around the corner edges of the frame and material is evenly tensioned and flat creating a nicely taut surface Incorrect material installation The corners of the screen...

Page 6: ...ion until making sure there are no ripples in the material Pre check prior to Edge Trim Installation Correct Distinguish the top and bottom of the CLR material Place the assembled screen on the ground...

Page 7: ...hold the LED light strip in place Wall Installation Step 14 Measure the overall length and height of the frame and drill holes for the top brackets Line up the wall brackets with the drilled holes on...

Page 8: ...below and push down at the center of the top of the frame to secure Step 16 With the frame slightly tilted outward connect the bottom brackets onto the bottom groove of the frame Then secure them by...

Reviews: