background image

11152019-JA 

www.eliteproav.com

 

 

 

Frame Assembly 

Step  1

:    Place  the  soft  padded 

EPE  sponge  on  clean  area  on  the 
ground  where  the  screen  will  be 
assembled. 

Step  2: 

Position the  pieces  of  the 

frame  on  the  EPE  sponge  in  the 
arrangement shown below 
 

Step 3

: Remove the foam in all frame ends before assembling the frame

  

 
 
 
 
 
 

Note: Springs are pre-inserted into the grooves of the frame.  Please make sure to  
avoid the springs from slipping out of the grooves when you remove the foam.

 

 

Step 4: 

Insert the 

center joint (a)

 connectors into 

one-half of the horizontal frame (b/c)

 and secure with the 

M4x6 screws (c)

.

 

Step 5: 

Connect the 

elbow joints (b)

 to the top and bottom sections of the vertical frame. Once inserted, connect 

the vertical sections of the horizontal frame sections. Make sure all holes are in alignment and the frame pieces 
are flush (no gaps). They should form perfect right angles. 

 

 

 

 

 

 

Step 6

: Secure the elbow joints by fastening them with 

M4x6 screws (c)

, 4 at each corner.

 

 
 
 
 
 
 
 
 

2. Hardware Parts List 

a. 

b. 

c. 

d. 

e. 

f. 

g. 

 

h. 

j. 

k. 

l. 

m. 

Remove the foam 

Summary of Contents for EDGE FREE Pro Frame Thin UST Series

Page 1: ...attention to the following instructions 1 The screen surface has a horizontal lens structure DO NOT wipe the screen up and down or in a circular motion Wipe very gently from left to right only 2 Pleas...

Page 2: ...F Item Parts List 100 120 a Center Joints 4 4 b Elbow Joints 8 8 c M4x6 Screws 60 60 d Spring Hook 2 2 e Spring pre installed 60 68 f Top wall brackets 2 2 g M5x50 Wall Screws 6 6 h Hollow Wall anchor...

Page 3: ...ure to avoid the springs from slipping out of the grooves when you remove the foam Step 4 Insert the center joint a connectors into one half of the horizontal frame b c and secure with the M4x6 screws...

Page 4: ...ully and gently place the assembled frame on top of the screen material Make sure to not allow the angle edge of the frame to come in direct contact with the screen material to avoid puncturing it Not...

Page 5: ...n material are properly wrapped around the corner edges of the frame and material is evenly tensioned and flat creating a nicely taut surface Incorrect material installation The corners of the screen...

Page 6: ...ion until making sure there are no ripples in the material Pre check prior to Edge Trim Installation Correct Distinguish the top and bottom of the CLR material Place the assembled screen on the ground...

Page 7: ...hold the LED light strip in place Wall Installation Step 14 Measure the overall length and height of the frame and drill holes for the top brackets Line up the wall brackets with the drilled holes on...

Page 8: ...below and push down at the center of the top of the frame to secure Step 16 With the frame slightly tilted outward connect the bottom brackets onto the bottom groove of the frame Then secure them by...

Reviews: