NOW YOU CAN FIT THE VENT TO THE RIDGE
11. Slide the vent onto the ridge from either end and into the desired position. Before sliding the
vent into the ridge, slide a piece of black tube into the vent hinge socket. Slide the vent into posi-
tion, insert a small self tapping screw into the length of the tube approximately ½ way along then
tighten the screw. The tube will expand and lock into position thus preventing sideways movement
of the vent.
N.B. There is no hole for the screw but it will easily push into the tube and screw up.
(Key Point).
You only require one tube per vent on the left hand side of the vent socket (viewed from inside the
greenhouse).
Having slid the vents from the end on the ridge to the desired position, you can now fit the “slam
bars” just under the vent allowing the casement stay to effectively close. The slam bar can be ad-
justed later to facilitate good opening and closing of the vent.
12. Do not fit the door at this stage.
13. The greenhouse is now ready for lifting on to its permanent base.
Summary of Contents for iGrow
Page 1: ......
Page 2: ......
Page 3: ......
Page 8: ...SIDE FRAME ASSEMBLY...
Page 12: ...DOOR END ASSEMBLY viewed from inside...
Page 16: ...ASSEMBLY OF GREENHOUSE UNIT...
Page 23: ......
Page 24: ...ELITE 1303...