ELGA MEDICA Pro EDI Quick Start Manual Download Page 4

ELGA 

MEDICA Pro EDI - US Quick Start Manual

 

 

Page 2

 

MEDICA Pro EDI MANU40683 Ver.2 

– 10/15 

 

 MEDICA Pro EDI 

3. 

INSTALLATION  

3.1  Unpacking MEDICA Pro EDI -US 

The following items are supplied: 

1. 

MEDICA Pro. EDI - US 

2. 

Electrical supply lead. 

3. 

Quick reference guide fitted on inside of door. 

4. 

MEDICA Pro Starter Kit 6 or 7 (to be ordered 
separatly). 

5. 

Installation kit (Included in starter kit). 

 

Maintenance 

Access  is  required  to  the  front  of  the  unit  for  regular  maintenance  procedures. 
Occasional access is required to the top of the unit to add chemical during sanitization. 

Electrical supply 

For  safety  reasons  it  is  recommended  that  this  unit  be  connected  to  a  suitable  power 
outlet which is easily accessible and local to the unit. 

Site 

The unit can be floor or bench mounted. Ensure the bench is designed to take a load in 
excess of 150kg and that the weight of other equipment is also taken into consideration. 

Water supply 

Local potable supply with a means of isolation. 

 

3.2  External services and connections 

 

UNIT OF MEASURE 

Connection 

Termination 

Specification 

METRIC 

US/IMPERIAL 

Feed water inlet* 

10mm OD Push fit 

Flow 
Pressure 
Temperature 

>9l/min 
2  to 6 bar 
4 to 40

>2.4USG/min 
30  to 88psi 
39.2 to 104

Pressurized drain  

10mm OD Push fit 

Maximum flow 
Maximum 
distance to drain 
Maximum back 
pressure 

10l/min 
 
3m 
 
0.2bar 

2.7USG/min 
 
10ft 
 
3psi 

EDI drain 

10mm OD Push fit 

Application loop feed 
 

12mm OD Push fit 

Maximum pipe 
length to 
application 

5m 

16ft 

Application loop return 
 

12mm OD Push fit 

Maximum pipe 
length from 
application 

5m 

16ft 

Application feed 
 

12mm OD Push fit 

Maximum pipe 
length to 
application 

3m 

10ft 

Electrical supply 

IEC 60320 

Electrical rating 

 

Electrical 
protection 

208-230 V ac 50/60 Hz  
100-115 V ac 50/60 Hz  

 

10 A 

*  Refer to Operator manual for feed water specification. Suitability of water supply must be confirmed before commissioning is commenced. 

 

Summary of Contents for MEDICA Pro EDI

Page 1: ...MEDICA Pro EDI US Quick Start Manual...

Page 2: ......

Page 3: ...sses 2 1 Electricity It is essential that the electrical supply to the MEDICA Pro EDI US is isolated before any items are changed or maintenance work performed The appliance coupler mains lead connect...

Page 4: ...d that the weight of other equipment is also taken into consideration Water supply Local potable supply with a means of isolation 3 2 External services and connections UNIT OF MEASURE Connection Termi...

Page 5: ...to enable access to the sanitization port Potable feed water tube connection 2 CONNECT both drains to local drain with tube supplied Note Ensure air gap is maintained from outlet of tube into a standp...

Page 6: ...EDI US Quick Start Manual Page 4 MEDICA Pro EDI MANU40683 Ver 2 10 15 4 CONNECT electrical supply lead into the socket on the rear of the MEDICA Pro EDI unit and to local isolated supply Electrical su...

Page 7: ...ashing CLOCK clock icon 2 PRESS SCROLL to edit time OR PRESS TICK to proceed to step 4 3 3 PRESS and UP to increase or DOWN to decrease hour 4 PRESS SHIFT to step cursor onto minute 5 PRESS UP to incr...

Page 8: ...ocated on the inlet and outlet of the Protek 5 OPEN the left hand door and locate the pre treatment position 6 LIFT wing and rotate anti clockwise 7 PIVOT latch and release retaining arm 8 SWING retai...

Page 9: ...Conditioning Cartridge LC206 1 SCREEN promt to install the conditioning Cartridge LC206 2 Remove the LC206 conditioning cartridge from packaging 3 REMOVE sealing plugs from inlet and outlet ports 4 W...

Page 10: ...lgalabwater com For the address of the nearest ELGA LabWater Sales and Service office visit the country list on our website http www elgalabwater com or contact ELGA at the number above 2015 ELGA LabW...

Reviews: