CENTRA - S200 US/CENTRA - R200 US Operator Manual
ELGA
Page 32
CENTRA - S200 US/CENTRA - R200 US Version 01 – 08/14
Step 9 - Sanitization
1.
SANITIZE the system as described in Section 10 -
Sanitization Procedures.
Note: It is good practice to sanitize new installations
during commissioning.
Step 10 - Fit 0.2µm in line filter (LC160) or FILT50105 for HF.
1.
Fit new or existing filter at the end of sanitization as
described in Section 9.3 - Replacing bacterial and
particulate filter.