
CENTRA-R 60/120 US Operator Manual
ELGA
Page 32
CENTRA-R 60/120 US MANU40596 Version 02 10/16
Reservoir level adjustment
6. REMOVE Labpure L1 (LC187) if installed and fit by-
pass block (LA698).
7. PRESS
to allow the system to empty/fill the
reservoir. The system will stop when the level
reaches approximately 10 liters.
Small white lid removal
8. UNSCREW lid on the right of the unit.
9. MEASURE out 250ml of Minncare Cold Sterilant and
SLOWLY POUR into the main reservoir.
10. REPLACE lid.
Confirmation the chemical is added
11. PRESENT GREEN sanitization key to confirm that
the chemical
has been added.
Summary of Contents for CENTRA-R 120 US
Page 1: ...CENTRA R 60 120 US Operator Manual...
Page 2: ......