12
elements
enabling technologies for Life Science
SECTION 2 –
General description and connections
Note:
please refer to paragraph
2.3 “Package”
.
2.4.3
Select the location
The mounting location should comply with the following characteristics:
a)
Avoid direct sunlight exposure.
b)
Make sure that
eONE
is properly (ergonomically) accessible to the op-
erator.
c)
Choose a suitable mounting height.
2.4.4
Checking the package contents
Check the package content for visible signs of transport damage and
for completeness.
In the case of damaged parts, contact your ELEMENTS S.R.L. repre-
sentative. Do not install parts damaged during shipment.
2.4.5
Checking the operating conditions
Read carefully the standards, approvals, EMC parameters and technical
specifications for operation of the device.
Follow the instructions for local use of the device: Notes about usage.
Summary of Contents for eONE
Page 4: ......