14
ENGLISH
3.5
Control unit for default
machine settings
The individual components need to be
connected to each other before being
connected to the mains and before inital
operation. By default the components as
set for gas-shielded arc welding:
1.
With the help of another person lift
the SWK (water cooling unit) and
place it on the Powerbox, to that its
feet stand between the pipes on the
rubber mat.
2.
With the help of another person lift
the SDV (wire feed unit) and place it
onto the water cooling unit.
3.
Connect the coolant hoses as illus-
trated below (see also the SWK
instructions).
4.
Connect the cables as illustrated
below.
The Powerbox is mounted on a wheel
set. With fitted SDV and SWK the com-
plete welding machine is conveniently
moved to the workplace.
Danger!
Close the cylinder’s valve
before relocating.
Danger!
Note the hight weight of the
welding machine. It may get out of
control, especially on sloping
ground!
Walk along the intended way, before
you set off with the welding machine.
Ask another person for assistance, if
necessary!
5.1
Crane hoisting
The welding machine can be hoisted by
crane.
Danger!
Remove the gas cylinder
before hoisting.
Hoisting with the gas cylinder is for-
bidden!
1.
Fit the hoisting straps as illustrated
below.
Caution!
At the workplace, secure the
machine against rolling away.
6.1
Manual arc welding
When setting the machine for manual
arc welding, you must:
1.
Check all connections.
Disconnect earth cable (- pole) and
welding current supply cable
(+ pole).
2.
Connect earth cable to the Power-
box - pole).
3.
Connect welding cable to the weld-
ing current supply cable (+ pole).
6.2
Gas-shielded arc welding
1.
Check all connections. Disconnect
earth cable (- pole).
The welding current supply cable
(Powerbox) must be connected to
the connector plug of the welding
current supply (SDV).
25
LED welding voltage [V]
26
LED arc length [%]
27
7-segment display (3 digits)
The display shows:
−
the value of the selected
parameter or
−
an error message.
28
Parameter adjustment
to adjust the selected parameter.
29
Wire thread-in button
(Manual Wire Feed Drive)
30
Operating mode selector switch
(Mode Selection)
31
Burnback time selector switch
(Wire burnback control)
32
Gas type selector switch
(Gas Type)
33
Wire diameter selector switchr
(Wire Diameter)
34
Wire type selector switch
(Wire Type)
4.
Installation
34
33
32
29
30
31
5.
Transport
6.
Preparing for Operation
A
V
Summary of Contents for mig mag 232 ep
Page 56: ...56 X_1Leer fm...
Page 57: ...57 X_2Leer fm...
Page 58: ...58...
Page 60: ...ZINDEL Technische Dokumentation und Multimedia www zindel de U4ba_eb2 fm...