
LG-10(C) thru LG-30(C) (Portable) - User Manual Electro-Steam Generator Corp.
6 of 30
1.2) INSTALLATION INSTRUCTIONS – SOLUTION MIXER
“OPTIONAL” (Continued)
NOTE:
Refer to “HydroMinder Model 511 Parts Diagram” on previous page for interpretation of
numbered & lettered items. For interpretation of numbered items with “#”, refer to Parts Legend
Drawing attached. For better understanding of installation of Solution Mixer, refer to drawing on
next page.
1.
Remove
Solution Bucket (#25)
from 2 predrilled holes on rear of generator, behind
Pump (#8)
.
2.
A red 2’ hose should be enclosed to attach incoming water connection to Solution Mixer. Attach tee
end of hose to
Water Inlet (#6)
.
3.
Reattach
Solution Bucket (#25)
into the 2 predrilled holes on rear of generator, behind
Pump (#8)
.
4.
Remove the
2 Screws (6k)
holding
U-Clamp (6i)
and reverse
U-Clamp
(6i)
to where
Thumbscrews (6m)
are on outside of
Solution Bucket (#25)
. This allows Solution Mixer to fit
more vertical and
Magnet Yoke (5g)
moves more freely.
5.
Attach Solution Mixer on side of
Solution Bucket (#25)
opposite the
Water Inlet (#6)
and
Steam
Out (#16)
. Tighten
Thumbscrews (6m)
.
6.
Attach
Discharge Tube Assembly (16)
to bottom of
Eductor Body Only (14s)
. Push tight on
flange.
7.
Remove
Metering Tip (15)
of your choice from enclosed packet and hand screw into
Suction Stub
Only (14t)
. (Green tip is suggested for initial start up. The solution mixture should be titrated, at end
of gun, or wand, with valve fully open by chemical supplier. Larger or smaller
Metering Tips (15)
may be required to achieve proper working concentration.)
NOTE:
For better understanding of metering tip selection, refer to section
“Metering Tip Selection:”
in the
HydroMinder Model 511 Manual
enclosed with Solution Mixer.
8.
Attach
Tubing 1/2” x 9’ (17u)
to
Suction Stub Only (14t)
. Push tight on flange.
9.
Place
Viton Foot Valve (17w)
into solution supply.
10.
Thread
Bead Chain Only (18x)
through loop on
Magnetic Yoke (5g)
. Pull
Bead Chain (18x)
close
so that
Float & Chain Assembly (18)
is suspended in
Solution Bucket (#25)
. If not suspended,
Solution Bucket (#25)
will never fill.
11.
Attach other end of red 2’ hose to
Hose Swivel (2)
.
12.
Verify that
Ball Valve (3)
is completely open.
13.
Solution Mixer is now ready for use.