17
Installation
9
5327
9
Installation S- and N-model
Leave the machine on the tran s port pallet until it
can be placed in the final, pre pared position.
Siting
Install the machine close to a floor drain or open
drain. In order to make installation and servicing
the machine easier the following clearances are
recommended:
• At least 500 mm between the machine and
the wall behind.
• Minimum 25 mm to next machine if more than
one machine are installed on a foundation.
Floor
In this type of machine, the drum is attached di-
rectly to the frame. As a result the floor under the
machine must be stable enough to absorb the
dy namic forces generated during spin cycles.
For that reason, the mounting bolts must be cast
into the floor material itself.
When fixing the machine to an existing cement
floor, it must be and at least 100 mm thick.
The floor must be able to withstand the loads in-
dicated in the table.
If it isn’t possible to cast the bolts into the floor,
an alternative might be to use so-called chemical
anchors. Your local dealer can provide the infor-
ma tion you need.