6.
OPERATION INSTRUCTION
6.2
Before normal operation of the shower, it is
essential that the following commissioning
procedure is completed correctly.
out any remaining debris, and to make sure
the heater unit contains water before the
heating elements are switched on.
1.
the water outlet but WITHOUT THE
SHOWERHEAD ATTACHED and the outlet
2.
Before turning on the electric and mains
water supplies to the shower, make sure that
you choose the cold setting by passing the
COLD button and the temperature knob is
turned fully clockwise to ‘MINIMUM’ flow
as
shown Fig.15.
3.
Turn on the mains water supply to the
shower at the isolating stopvalve and then
turn on the electric supply to the shower at
the isolating switch.
CAUTION!
Failure to turn the control to the
the PRD(Pressure Relief Device) to
operate.
CAUTION!
Fig. 15
Fig. 14
Temperature
Pass the COLD
button to choose
the cold setting.
Turn the temperature
knob fully clockwise
to “MINIMUM” flow.
6.
When a smooth flow of water is obtained,
rotate the temperature control from MINIMUM
to MAXIMUM several times to release any
trapped air within the unit.
Fig. 16
Temperature control -
Turn fully anti-clockwise
to MAXIMUM flow
4.
Press the On/off button
an
d wait until
water starts to flow from the flexible hose.
5.
Slowly rotate the temperature control fully
anti-
clockwise to the MAXIMUM flow position
(Fig.16).
It will take about thirty seconds for a
smooth flow of water to be obtained while air
and any debris is flushed from the shower.
18 www.electrolux.com