SOI/TD 2004-11 PR
25/26
599 36 44-44
15 CHECKING THE EFFICIENCY OF THE COMPONENTS
In order to facilitate the control procedure for the components to be tested, a TEST PROCEDURE has been
created which indicates the point to which the probes of the tester should be applied and the correct
theoretical value for each component tested.
Remove the door and detach all the connectors from the main board.
Connect the probes of the tester to the appropriate points on the connector. Compare the ohmic reading
with the theoretical value
.
Care should be taken relative to the position of connector "
B1
" - "B
2
": if this connector is
replaced in the incorrect position (back-to-front), the appliance will not function since the power
supply will be disconnected.
15.1 Measurement points on the board wiring connectors
LIST OF COMPONENTS
PROBE
CONTACTS
CORRECT VALUES
NOTES
(RR) - HEATING ELEMENT
+
(TS) - SAFETY THERMOSTAT
A1
D5
25
Ω
±
8%
connected in series
(2100W)
INFINITE
on "EMPTY" (1-2)
(PR) - LEVEL PRESSURE SWITCH
A1
A2
0
Ω
on "FULL" (1-3)
INFINITE
on "EMPTY" (1-2)
(PA) - ANTI-FLOODING PRESSURE
SWITCH
D1
B2
0
Ω
on "FULL" (1-3)
(IP) - DOOR MICROSWITCH
C1
C3
0
Ω
Door closed
(DD/DB) - INTEGRATED DISPENSER
E1
E3
1.500
Ω
± 8%
OK
INFINITE
with Rinse-aid
(SB) - RINSE-AID SENSOR
G3
G4
0
Ω
without Rinse-aid
INFINITE
with salt
(SS) - SALT SENSOR
G1
G2
0
Ω
without salt
4850
Ω
± 5%
(a
25ºC)
(ST) - TEMPERATURE SENSOR
H1
H3
1205
Ω
± 5%
(a
60ºC)
(ER) - REGENERATION SOLENOID
C1
D9
6 K
Ω
± 8%
OK
(EC) - FILL SOLENOID
+
(AA) - ANTI-FLOODING DEVICE
D7
D11
3.800
Ω
± 8%
connected in series
D3
D11
50
Ω
± 8%
start-up winding
(PL) - WASH MOTOR
To the 2 motor wires
(bl) / (ro)
180
Ω
± 8%
auxiliary winding
(PS) - DRAIN MOTOR
D1
C1
180
Ω
± 8%
OK