
12. Functions sequences
12
Service
manual
487 03 29 91
12.2
General
To facilitate fault-tracing in the electrical system, the description which follows has been
divided into function sequences. At the end of this section there is also a table listing a
number of measurement points.
The following sequences are described here:
• Power supply
• Start of extraction
• Lid opening
• Stop after extraction
• Imbalance during extraction
• Measurement points
Power supply (230V, 50 Hz; 400-415V, 50 Hz; and 440V, 60 Hz)
Machine power supply can be 230, 400, 415 or 440 V 3 AC. An auxiliary transformer is
supplied with two of the line voltage phases and steps down the mains voltage to 24 V
control voltage. The auxiliary transformer is protected by two fuses, one on the primary
side (F1) and one on the secondary side (F2).
The auxiliary transformer supplies the circuit board for automatic functions and the other
components in the control circuit with control voltage.
1
1
R2-R1
Summary of Contents for C240
Page 1: ...Service Manual C240 C260 C240R C260R C290R 487 03 29 91 EN 08 28 ...
Page 2: ......
Page 4: ......
Page 8: ......
Page 10: ......
Page 12: ......
Page 19: ...487 03 29 91 12 7 12 Functions sequences 12 Service manual 4 S1 6 S1 7 S4 2 Y1 H1 SW2 R2 R1 ...
Page 23: ...487 03 29 91 12 11 12 Functions sequences 12 Service manual 6 S2 2 SW3 R1 R2 ...
Page 27: ...487 03 29 91 12 15 12 Functions sequences 12 Service manual F E D C B A R1 R2 ...
Page 28: ......
Page 36: ......
Page 40: ...www electrolux com laundrysystems Share more of our thinking at www electrolux com ...