Contents
HOW TO DESIGN A BEAM CENTRAL VACUUM SYSTEM
Choose the location of your Beam Appliance
Choose where the wall inlets/sockets should be placed
Typical Installation - Floorplans
Plan where the pipe/duct work can be hidden
INSTALLING YOUR PIPEWORK
Solid Wall Diagrams
Dropping from the other side of the wall
Chasing-up through the wall
Close-Ups
Floor-mounted inlet Diagrams
with pipework in timber joist floor
with pipework in solid floor
Timber Partition/Stud Wall Diagrams
Side-On
Face-On (without inlet)
VacPan Installation Diagrams - Side-on
Personal Clothes Brush Installation Diagrams
Side-on
Face-on
Wiring the Inlets & the Appliance
5 RULES OF INSTALLING A BEAM CENTRAL VACUUM
1 The Pipework
2 Sweep T
3 Glue
4 Low Voltage Wire
5 Sharp 90 bend
Normal Installation Components
Tools Required
Our Contact Details
3
3
4
5
6
7
7
7
8
8
8
9
10
11
12
13
14
15
16
16
16
2