
24
G.8
Fixing the side panels
G.8.1
Panels with a 12,5 mm overhang
Attach connecting rails
B
and
C
with the supplied
screws
A
. Make sure marking on part
B
on the rail is
pointing forwards.
Bring the side panel
D
into position.
Put the 5 hooks of the panel
F
into the slots
E
.
Insert the hooks on the bottom of end rail
G
into the
eyelets of the connecting rail.
Slide end rail
G
in the direction of the arrow to align
it to the front.
1
2
A
B
C
D
D
E
F
E
F
3
4
G
G
Summary of Contents for thermaline 1/1 GN
Page 32: ......
Page 33: ......
Page 34: ...Electrolux Professional AG Allmendstrasse 28 CH 6210 Sursee www electroluxprofessional com ...