Doc
#
E180701
2-7
2: Installation
Electro
Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions
Electro
Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions
2.2.1: Removing and Reinstalling the Panel
If it will make it easier to drill the wiring holes, you may remove the panel.
Figure 2.4: Removing the Panel
1. If the MP200
TM
in enclosure is equipped with a ProtoCom/ProtoCom-Lon add-on
protocol unit remove all connections from the ProtoCom/ProtoCom-Lon (I).
2. Disconnect the green ground wires from the door (E).
3. Open the cable clamps on the door (J) and remove the cable assembly (F).
4. Remove the green ground wires on the lower left side of the enclosure (D).
5. Remove the four nuts, one in each corner of the panel [K].
6. Carefully remove the panel from the enclosure.
Drill the wiring holes per the instructions in Section 2.2. You can then re-install the
panel.
1. Place the panel on the four mounting studs in the enclosure and install and tighten
a nut on each of the studs (K).
I
E
D
J
K
F
Summary of Contents for Shark MP200
Page 1: ...V 1 07 June 24 2019 ...