CONTROL SYSTEM
11-12
SM PXD 1-E.3 GB
11.5 Heating
Mode
11.5.1
Heating Mode - General
a. Compensation
Procedure
When I-FEEL is OFF during HEAT mode: RT= RAT – CTV.
When I-FEEL is ON during HEAT mode: RT= RCT.
Type of Indoor
CTV
Wall Mounted
+3
o
C
Mobiles / Floor Ceiling
+0
o
C
Square /Window
+2
o
C
4
o
C
Cassettes
+4
o
C
No compensation will be activated in Forced operation modes
b. IFAN operation rules for RC and SH groups:
1) As
a
general
rule
for
RC and SH groups,
IFAN will be switched ON according
to the following graph:
NOTE 1
When COMP is ON (except WAX Model), IFAN will change from
LOW to OFF either when:
a) ICT<28 and IFAN is on for 5 min or longer.
Or,
b) ICT<20
NOTE 2
When ICT is faulty:
When the compressor switches from OFF to ON (excluding
deicing), IFAN will be on in ANY speed.
When the compressor switches from ON to OFF, the IFAN will
change to LOW speed for 30 seconds and then it will be off.
2) In SH or RC group, IFAN will operate for Min 30 sec according to 1) above
after HEs are turned off, where in a case it has to be OFF, it will be forced to
LOW speed.
30
17
32
20
ANY
LOW
OFF
IFAN
ICT
40
25
Ducted
General:
Window:
Note 1
CONTENT
Summary of Contents for GC18 ST/RC
Page 58: ...WIRING DIAGRAMS 7 5 SM PXD 1 E 3 GB 7 9 Outdoor Unit OU7 24 OU8 30 3PH CONTENT...
Page 60: ...ELECTRICAL CONNECTIONS 8 2 SM PXD 1 E 3 GB 8 3 PX 18 24 30 3PH CONTENT...
Page 62: ...REGRIGERATION DIAGRAMS 9 2 SM PXD 1 E 3 GB 9 1 2 PXD 24 R410A CONTENT...
Page 63: ...REFRIGERATION DIAGRAMS 9 3 SM PXD 1 E 3 GB 9 1 3 PXD 24 OU7 24Z R410A CONTENT...
Page 64: ...REGRIGERATION DIAGRAMS 9 4 SM PXD 1 E 3 GB 9 1 4 PXD 30 R410A CONTENT...
Page 69: ...CONTROL SYSTEM 11 3 SM PXD 1 E 3 GB 11 1 4 Main PCB Controller CONTENT...
Page 110: ...EXPLODED VIEWS SPARE PARTS LISTS 13 5 SM PXD 1 E 3 GB 13 5 Indoor Unit PXD 18 24 30 CONTENT...
Page 114: ...EXPLODED VIEWS SPARE PARTS LISTS 13 9 SM PXD 1 E 3 GB 13 9 Outdoor Unit ONG 9 12 ST CONTENT...
Page 117: ...EXPLODED VIEWS SPARE PARTS LISTS 13 12 SM PXD 1 E 3 GB 13 12 Outdoor Unit ONG 9 12 RC CONTENT...
Page 120: ...EXPLODED VIEWS SPARE PARTS LISTS 13 15 SM PXD 1 E 3 GB 13 15 Outdoor Unit ONG 14 ST CONTENT...
Page 122: ...EXPLODED VIEWS SPARE PARTS LISTS 13 17 SM PXD 1 E 3 GB 13 17 Outdoor Unit ONG 14 RC CONTENT...
Page 124: ...EXPLODED VIEWS SPARE PARTS LISTS 13 19 SM PXD 1 E 3 GB 13 19 Outdoor Unit GC 18 ST CONTENT...
Page 126: ...EXPLODED VIEWS SPARE PARTS LISTS 13 21 SM PXD 1 E 3 GB 13 21 Outdoor Unit GC 18 RC CONTENT...
Page 159: ...APPENDIX A 15 1 SM PXD 1 E 3 GB APPENDIX A INSTALLATION AND OPERATION MANUAL CONTENT...