Eldan Recycling A/S
Page
38
13. MAINTENANCE
Maintenance work on the installation must be carried out by suitably qualified
personnel using special materials and tools.
The purpose of maintenance is to check the installation to ensure that it
complies with current regulations. Maintenance of the system is divided into
two points:
The panel
The rest of the system
13.1 The
panel
The panel must be checked at least once a year as follows:
Contact rails and conduit connections.
Joints and connections must be visually inspected. The panel must also be
cleaned of dust, moisture, etc. during the inspection.
Components
Maintenance and inspections must be carried out in accordance with the
manufacturer’s instructions for each component. All components must be
tested to ensure that they function mechanically as intended.
External casings and covers
The panel’s outer casings must be checked visually. Covers must be
inspected to ensure that they provide the correct protection against direct
touch.
All covers must be checked for faults on closing devices.
Summary of Contents for MPR200T
Page 1: ...ELDAN MULTI PURPOSE RASPER MPR200T Serial number 34222 Delivery date Customer...
Page 2: ...Manual for ELDAN MULTI PURPOSE RASPER MPR200T 1 1...
Page 12: ...Figure 1 ELDAN Recycling A S Page 10...
Page 41: ...Figure 13 ELDAN Recycling A S Page 39...
Page 61: ...ELDAN Recycling A S Page 59 Figure 17...
Page 80: ...Manual for Hydraulic System 1 2...
Page 84: ......
Page 93: ...Operational manual 1 3...
Page 137: ...Eldan Recycling A S Page 44 15 CONTROL PANEL...
Page 138: ...Electrical diagram 1 4...