
18
Operating manual VARION® C-POWER 50.0 / 09.2019
Assembly
5.3.3 Positioning the generation unit
D
ATTENTION!
Risk of damage to the generation unit caused by improper
transportation.
In narrow transportation routes, it may be necessary to
disassemble parts of the generation unit in order to move
the device into the installation location. Disassembly for
transport may only be carried out by the manufacturer.
A
Contact the manufacturer.
A
Select a suitable installation location.
D
“5.2 Installation location requirements” (page 13).
A
Position the balance strips.
A
Place the generation unit on the balance strips.
A
Ensure that the generation unit stands level.
5.3.4 Screwing the control cabinet in position
A
Open the control cabinet.
A
Mark the drill hole positions on the wall.
A
Drill the holes for the screws.
A
Screw the control cabinet onto the wall.
A
Observe the minimum distances.
D
Summary of Contents for VARION C-POWER 50.0
Page 1: ...Made in Germany Operating manual Combined heat and power unit VARION C POWER 50 0 09 2019...
Page 41: ...41 Operating manual VARION C POWER 50 0 09 2019 Appendix...
Page 42: ...42 Operating manual VARION C POWER 50 0 09 2019...
Page 43: ...43 Operating manual VARION C POWER 50 0 09 2019...