04/2009 - Art. Nr. 4200 1018 1100A
5
Installation
Assembly
Boiler face
• Prepare face following the enclosed
space requirement diagram.
• If required, insert face counter-plate
(optional)
• Fill in space
1
with recommended
heat-resistant material or material
supplied by the boiler manufacturer.
Chamber pressure take- off
pF
should
never be choked.
Combustion head
• Position combustion head, so that gas
train is horizontally connected on the
right
.
• The other assembly positions are not
allowed.
• Fix and secure combustion head with
its gasket on boiler face.
• Check subsequently for leaks.
Gas train
• Check presence and position of gasket
on the flange of gas train
B
.
• Install support PG 21 (drawing)
• When fitting gas train, valve coils must
be in
high vertical position
.
Important
When using a left-mounted VGD gas
train, the SKP75 regulator should pivot
by 180°. To that end :
• Remove regulator SKP75.
• Remove connector (3P + T) on the
side of the regulator, and put it back
together on the opposite side.
Seal off the former position of the
connector.
• Reassemble the regulator after it has
pivoted by a half turn (180°).
Burner Body
• Hook burner body to combustion head
using fixed pin
F
located on the
opposite side of the gas train.
• Connect the ignition cables on both
transformers.
• Close the burner body with removable
pin
E
.
• Fix safety screw
D
.
Connecting the gas pressure take-offs
• Connect coupling
pF
of the valve to
the coupling labelled
pF
on the
combustion head with two reversible
preformed tubes (right - left) ,which
are connected up by a coupling (see
drawing).
• Crimp the rings on the tubes.
• Connect the coupling labelled
pL
to
the coupling
pL
of the valve.
• Tighten nut by hand.
• Check subsequently for leaks.
Fitting the leaks controller
VPS 504 S02
• Remove the two screws
pa
and
pe
on
valve MBVEF, and the two screws
1
and
2
on valve VGD.
• Make sure the two O-rings are
available on the VPS.
• Fasten the VPS with the 4 self-forming
screws
• Connect the cord of plug 7P according
to the electrical diagram.
• Connect plug 7P to the VPS.
• Check subsequently for leaks
Case of valve VGD20 : proceed as
indicated at the beginning of the earlier
paragraph, then :
• Fit the tubes and the terminal block
supplied.
• Fasten the VPS on the terminal block
using the 4 self-forming screws
supplied.
• Proceed afterwards as in earlier
paragraph.
en
Summary of Contents for ES08.2800 G/F-VT
Page 39: ...04 2009 Art Nr 4200 1018 1100A 39 B C E F D F6 M1 T2 Y10 1 2 5 8 9 11 14 119 2 pF 113 3 pL ru...
Page 40: ...04 2009 Art Nr 4200 1018 1100A 40 305 370 PG21 pF pL...
Page 42: ...04 2009 Art Nr 4200 1018 1100A 42 5 ES08 2800 400 50 230 50 ES08 4000 5000 630 1 2...
Page 43: ...04 2009 Art Nr 4200 1018 1100A 43 ru...
Page 54: ...04 2009 Art Nr 4200 1018 1100A 54 1 pF 2 D...
Page 55: ...04 2009 Art Nr 4200 1018 1100A 55 VPS P 1 1 I I ru...