Pagina 23 van 24 

GDR 

22/12/04 

Manual The Big One II 

 

 

 

 

  Connect the crane to the current network (outside the head). 

Summary of Contents for The Big One II

Page 1: ...s a Wooden crosscut b Metal crosscut c Indus 5mm 2 Ladders 1 Rubber hammer 1 Cutting pliers 1 Drill 3 6mm Sequence of operation After you have removed the plastic foil you will see the manual at the b...

Page 2: ...r bolts at the front Unscrew the front boards so that the front side of the crate can be removed Remove the orange cord Check the contents of the plastic bag on the prize box Take the plastic bag with...

Page 3: ...Pagina 3 van 24 GDR 22 12 04 Manual The Big One II Construction Take the back side of the crane out of the crate and put it on the supplied wooden blocks 2 blocks wall MANUAL...

Page 4: ...Big One II Take the left side out of the crate and put it square with the back side Look at the position of the brackets on the photo for the difference between the left and the right side Anchor bot...

Page 5: ...t to the back side with 3x screw n 3 this is only temporarily so do not screw them completely Remove the red spanwires with which the gantry is attached and push the gantry forward Take the profiles i...

Page 6: ...Pagina 6 van 24 GDR 22 12 04 Manual The Big One II Screw the 3 bolts n 3 Remove one board of the crate to take out the prize box...

Page 7: ...e Big One II Remove all bags with red balls Unwrap the prize box and put it in the crane the prize box can not pass through the doorway Take the frontwall out of the crate and anchor it with the two s...

Page 8: ...22 12 04 Manual The Big One II Remove the plastic of the wooden backpanel Assemble the wooden backpanel with 4 screws n 9 Remove the red spanwires from the three wheelconstructions Put them according...

Page 9: ...eelblocks so you can put them across the lower profiles Drill holes for the screws with a 3 6 mm drill and attach the wheelblocks at the crane Use screw n 4 Screw the wheelblocks on to the crane as fo...

Page 10: ...Pagina 10 van 24 GDR 22 12 04 Manual The Big One II o Attach the wheelblocks in the middle of the front and the back side...

Page 11: ...Pagina 11 van 24 GDR 22 12 04 Manual The Big One II o Place the wheelblock at the right side o Make a crossconnection in the middle...

Page 12: ...nnection with the left side When the floor construction is difficult to install you can assemble the wheelblock first so that you can put it separately Afther that you re attach all the parts Remove t...

Page 13: ...head in the crane Screw with 3 butterfly screws n 1 7 6 the top on the upper profile in the front wall Screw the 2 wooden screws on the spotlight construction in a way that the 2 spots turn inside No...

Page 14: ...24 GDR 22 12 04 Manual The Big One II Put the lampshade back at their place and attach them with the assembled screws n 4 Place the back roof panel with alu profile on the roof and slide it into the m...

Page 15: ...Pagina 15 van 24 GDR 22 12 04 Manual The Big One II Slide the front roof panel into the crane until it lies in the right position...

Page 16: ...ed and put the cable on top of the prize box Turn the attachment corner on the back of the crane Install the prize box Tip over the prize box in the floor construction first to the back and then to th...

Page 17: ...ize box at the front side with a screw n 4 Put the floor plates in the crane Start with the largest plate Make sure that the u shaped hole is at the back Put the plate first in its place at the front...

Page 18: ...Pagina 18 van 24 GDR 22 12 04 Manual The Big One II Now place the 3 other floor plates...

Page 19: ...anwires from the grab Take the gantry out of the crate and put it in the crane Make sure that the Elaut nameplate is visible from the front side of the crane Take the grab out of the grab bar and hang...

Page 20: ...gina 20 van 24 GDR 22 12 04 Manual The Big One II Remove the protection foil of the aluminium cable channel Put the cable of the prize box up in the head and assemble the cable channel with 2x screw n...

Page 21: ...Pagina 21 van 24 GDR 22 12 04 Manual The Big One II Connect this cable to the gantry cable and hang it up at the fasteners...

Page 22: ...Pagina 22 van 24 GDR 22 12 04 Manual The Big One II Connect the grey cable and the speakers as the photos below Take the mains lead of the control panel and plug it in inside the head...

Page 23: ...Pagina 23 van 24 GDR 22 12 04 Manual The Big One II Connect the crane to the current network outside the head...

Page 24: ...The Big One II Remove the protection foil of the remaining wooden panel and put it in the doorway Place the sealing sections at the corners of the crane Use a rubber hammer Spread all the red balls i...