![Elaflex Oasis FV100 Series Instruction Manual Download Page 4](http://html.mh-extra.com/html/elaflex/oasis-fv100-series/oasis-fv100-series_instruction-manual_2375267004.webp)
4
We reserve the right to modify product specifications without prior notice.
FV103
-
INS
-
01 2822 © Oasis Engineering Limited
1. Apply anti seize to hose fittings and
torque to 70 Nm.
4. Tighten vent fitting and hose to the
manufacturers instructions.
2. Apply anti
-
seize and attach main hose,
tighten the connection to the hose
manufacturers instructions.
6. Test for leaks before use, place fill valve
and nozzle in bucket of water with valve
open and look for bubbles. Use snoop or
soapy water for unsubmerged connections.
3. Attach vent fitting and tighten to
manufacturers instructions.
5. Attach nozzle as per manufacturers
instructions.
Test for 1 minute
When testing the valve, ensure the
valve is held securely and opened
slowly for the first time after servicing.
If any leakage occurs then stop test
and do not use nozzle. Contact Oasis
for help.
Recommend
Torque: 70 Nm
Installation
45
o
& 90
o
Valve