![Elaflex Oasis FV100 Series Instruction Manual Download Page 12](http://html.mh-extra.com/html/elaflex/oasis-fv100-series/oasis-fv100-series_instruction-manual_2375267012.webp)
12
We reserve the right to modify product specifications without prior notice.
FV103
-
INS
-
01 2822 © Oasis Engineering Limited
Click
5. Place end cap O
-
ring.
4. Insert Seat and O
-
ring.
3. Insert ball.
1. Insert O
-
ring and seat.
Recommended
Torque: 60 Nm
1 5/16”
6. Torque end cap to 60Nm.
2. Insert stem.
Servicing
Assembly