![Elaflex Oasis FV100 Series Instruction Manual Download Page 3](http://html.mh-extra.com/html/elaflex/oasis-fv100-series/oasis-fv100-series_instruction-manual_2375267003.webp)
3
We reserve the right to modify product specifications without prior notice.
FV103
-
INS
-
01 2822 © Oasis Engineering Limited
3. Attach vent fitting and tighten to
manufacturers instructions.
4. Tighten vent hose to the hose
manufacturers instructions.
1. Apply anti seize to hose fittings and
torque to 70 Nm.
2. Attach main hose, tighten the connection
to the hose manufacturers instructions.
Test for 1 minute
6. Test for leaks before use, place fill valve
and nozzle in bucket of water with valve
open and look for bubbles. Use snoop or
soapy water for unsubmerged connections.
When testing the valve, ensure the
valve is held securely and opened
slowly for the first time after servicing.
If any leakage occurs then stop test
and do not use nozzle. Contact Oasis
for help.
5. Attach nozzle as per manufacturers
instructions.
Recommend
Torque: 70 Nm
We reserve the right to modify product specifications without prior notice.
FV103
-
INS
-
01 2822 © Oasis Engineering Limited
Installation
Straight Valve