Page 12 of 16
Release 1.0
User Manual
PAT-Chamber-16
6 EC-Link software
How to install and operate with the EC-Link software is described in a separate manual.
Please note that the EC-Link software is only required for the standard configuration of the
PAT-Chamber-16, which contains a data logger. A passive version of the PAT-Chamber-16
without a data logger is available on request.
7 Cleaning
Wipe the PAT-Chamber-16 with a moist tissue.
Do not use aggressive chemicals for cleaning
.
Protect the PAT-Chamber-16 from dust and splash water.
8 Unpacking
Check the contents of the packages against the list given below to verify that you have
received all of the required components. Contact EL-CELL, if anything is missing or damaged.
NOTE
: Damaged shipments must remain within the original packaging for freight company
inspection.
List of components
PAT-Chamber-16
ECC1-03-0300-A
optionally with PAT-Connect-16 C
ECC1-03-0130-A
Power cord
ELT9412
USB cable (Type A/B; 2,0m)
ELT9167
EC-Link installation CD
ECE1-00-0052-A
NOTE
: The cables for connection between PAT-Chamber-16 and the external battery tester
must be ordered separately.