![EL-CELL ECC-Opto-Std User Manual Download Page 12](http://html1.mh-extra.com/html/el-cell/ecc-opto-std/ecc-opto-std_user-manual_2375071012.webp)
Page 12 of 19
User Manual ECC-Opto-Std – Release 2.62
Different spring forces in relation to stack thickness:
A compression spring exerts the mechanical pressure on the cell stack.
Different springs with a nominal pressure of 10, 20 and 30 N are available.
The applied pressure slightly depends on the thickness of the cell stack.
6 Disassembly and Cleaning
Right after use, disassemble the cell in the reverse order of assembly. All chemicals
used have to be disposed properly. All wetted parts are to be cleaned with water and/or
other appropriate solvents. All parts are to be dried immediately after cleaning at 80°C.
NOTE: Leaving cell parts in contact with ambient atmosphere while still being wetted
with electrolyte may result in severe corrosion.