/ 9 /
STEP 3
Thumb nut
Coiled
spring
STEP 3.:
Align the water block over the
mounting screws on the LGA-
2011(-3) motherboard with pre-
installed CPU.
Before proceeding with the
installation It is mandatory
to remove the protective
foil from the backside of
the water block.
Place an enclosed compression
spring and thumb nut over each M4
thumb screw. Start fastening two
thumb nuts at a time, preferably in
cross pattern and do not tighten
them fully until all of them are partially
screwed in. Then - using your fingers
only - screw in all four thumb nuts
until you reach the end of the thread.
Summary of Contents for Supremacy EVO
Page 1: ...Supremacy EVO 7th revision Mar 4th 2016 USER GUIDE...
Page 2: ......