All disclosures, notices and warranty conditions are being written on the back of the box.
Released on 18
th
of April, 2011.
3. PLACING STANDOFFS ON BLOCK. Standoffs are obligatory to make this block fully
functional. Please use small amount of thermal grease on standoffs and glue them so they
are concentric with mounting holes. Once they are stuck to block be careful not to move
them.
4. PLACING BLOCK TO GRAPHIC CARD. During this process please make sure
you align holes on PCB with holes on block. Also pay attention not to use too
much force by pressing block down to PCB. Chip dies are prone to cracking.
5. ATTACHING BLOCK TO GRAPHIC CARD. By using Philips screwdriver first
screw in seven (7) enclosed M3x8 screws. Please use the enclosed plastic
washers with these screws.
STEP 4: CHECKING FOR CONTACTS
Temporarily remove the water block to check for uniform surface contact between the block and the components. Note the pattern of contact on a piece of paper. Then repeat
substeps in previous section to reattach the block.
In case you fail to obtain good contact, please check again your thermal pad thickness or contact our support
service.
STEP 5: SECURING I/O BRACKET
STEP 6: FITTING POSITIONING
Use one M3x8 screw, one PVC washer and one M3 nut to secure the I/O (also known
as PCI) bracket firmly to the circuit board. This will allow the computer chassis to carry
the weight of the waterblock thus reducing the tension on the PCI-express slot.
Tighten the screw with Philips screwdriver while holding the M3 nut with your thumbs
firmly.
Screw in the fittings and plugs. Use 6mm Allen key to screw in and tighten the EK-Plug
G1/4. If you are using the fittings with threads longer than 5mm please use the 3mm
G1/4 spacer. Attach the liquid cooling tubes and connect the water-block(s) into the
cooling circuit. EKWB recommends using EK-PSC fittings with the EK-FC series water
blocks. To ensure that the tubes are securely attached to the barb/fittings, please use
hose clamps or an appropriate substitute. The use of an algaecide is always
recommended for any liquid cooling system.
You can use any opening as an inlet/outlet port.
STEP 6: INSERTING CARD IN YOUR PC CASE
Carefully lift your card with installed block and insert it in your PC case. Please bear in mind that your card suddenly withstands extra weight thus again be very careful not to
bend it or cause any other unneeded moves that might damage your card or block during installation.
REQUIRED TOOLS AND MOUNTING SCREWS:
scissors
philips screwdriver
8× screws M3x8 DIN7985
8
×
Polyamid washers
1
×
M3 nut
Standoff key
Standoff
M3x8 DIN7985 screws
Polyamid washer
Placing the standoffs:
Fitting with o-ring
Spacer
O-ring
EK-PSC Fitting
M3x8 screw
PVC washer
M3 nut