15
STEP 11
Screw the adapters into each water block port by rotating the knurled section.
Tighten in a clockwise direction until the seal underneath is compressed.
STEP 12
Now tighten the compression rings on the distribution plate to complete the
loop and secure all of the tubing in place.
For this step you will need:
See image of your specific
GPU block below.
See image of your specific
GPU block below.
STEP 13
INSTALLATION OF TUBES FOR GPU BLOCK
Assemble both of the pre-cut tubes from the GPU pack as shown in the
image for your specific GPU block. For detailed instructions about how to
install tubes with fittings, see STEP 9 to STEP 12 on pages 14 and 15. Be
sure to orient the tubes correctly during the installation and that you use the
correct fittings.
ATTENTION: Do not cut the tubes for the GPU block because
they are pre-cut.
STEP 11
STEP 12
V. Final Assembly
ALU-AF 90° adapter (2 pcs)
ALU-HDC fitting (4 pcs)
GPU tube 1 (1 piece)
GPU tube 2 (1 piece)