TESTING THE LOOP
To make sure the installation of EK components was
successful, we recommend you perform a leak test for
24 hours.
When your loop is complete and filled with coolant,
connect the pump to a PSU outside of your system.
Do not
connect the power to any of the other components.
Turn on the PSU and let the pump run continuously. It is
usual for the coolant level to drop during this process as
air collects in the reservoir.
Inspect all the parts of the loop, and in the case of
coolant leaks, fix the issue, and repeat the testing
process. Ensure that all hardware is dry before the
system is powered on in order to prevent any damage.
Summary of Contents for 3831109819630
Page 1: ...INSTALLATION MANUAL EK Quantum Kinetic TBE DDC PWM PUMP RESERVOIR COMBO...
Page 8: ...8 USING TOP PORT AS INLET Internal Tube EK Quantum Kinetic TBE DDC EK Fitting...
Page 10: ...10 ATTACHING FITTINGS INLET OUTLET EK Plugs G1 4...
Page 12: ...12 CONNECTING THE D RGB LIGHTS D RGB Header RGB Header...
Page 15: ......