3
EKOVENT AB
We reserve the right to make changes
2020-12
Product handling on the construction site
Transport
The Self-actuating backflow protectors are
transported to the construction site with a
forklift or crane with a lifting fork. To avoid
damage, they must be lifted, not drag-
ged and never lowered hard against the
ground.
Reception and inspection
of the delivery
The Self-actuating backflow protectors is
inspected immediately when the delivery
arrives at the workplace. The inspection is
to check that the delivery corresponds to
the order and the consignment note. The
approved delivery is acknowledged on the
consignment note. Products with defects
or defects must not be installed. Contact
the supplier immediately.
Storage
The storage of materials on the site should
be planned so that you get the least pos-
sible internal transport. Self-actuating
backflow protectors must be protected
against water and always stored in a dry
place. Furthermore, they must be handled
so that no mechanical damage occurs to
them.
Commissioning
The Self-actuating backflow protectors
must not be put into use until the entire
installation is in operational condition.
– Damage due to incorrect transport,
handling or storage.
– That the user has failed to inspect,
maintain and to a reasonable extent
take care of the equipment.
– Personal injury or property damage as
a result of using the product in violation
of the instructions and specifications in
this manual.
EKOVENT AB hereby disclaims all responsibility for:
EKOVENT:s liability shall be limited to repair
or replacement of faulty equipment part.