background image


 

Table of Contents 

  

 

 

General Information……………………………………………………………………………………………3  

Read these instructions thoroughly  before installing and starting the burner…………………………3 
Guarantee………………………………………………………………………………………………….….3 
Delivery Packing List Check…………...………………………………………………..…………………..3  
Access and Free Space around the Burner......................................................................................3 
Ashes...............................................................................................................................................3 
Boiler Room Air Supply  ...................................................................................................................3 
Pellets    ………………………………………………………………………………………………….……3  

Installation..........................................................................................................................................4 

Pellet storage and Feed Screw ........................................................................................................4 
Design and internal structure............................................................................................................4 
Temperature Gauge PID Regulator (standard) and Lambda Sensor ................................................4 

Installation Instructions.....................................................................................................................5 
Adjustments of the Burner ................................................................................................................8 

Delivery Settings ..............................................................................................................................8 
Chimney Draught .............................................................................................................................8 
Negativ Pressure in Combustion Chamber  ………………………………………………………….….  8 
Photocell  .........................................................................................................................................8 
Setting the Thermostats ...................................................................................................................8 
Pellets Priming Measure ..................................................................................................................8 
Start and Stopp the Burner...............................................................................................................8 
Fuel Quantity and Pellets Travel Time to the Burner …………………………………………………… 9 
Adjustment of Air Supply to the Burner ............................................................................................9 

Maintenance and Service ................................................................................................................10 

Cleaning the Burner .......................................................................................................................10 
Photocell ........................................................................................................................................10 
Electric Ignitiers..............................................................................................................................10 
Back-burn Protection......................................................................................................................10 
Sprinkler.........................................................................................................................................10 
The Equipment’s Safety Systems...................................................................................................10 
Electrical Connection Diagram………………………………………………………………….…………11 
Connecting ....................................................................................................................................11 

Technical Data  ……………………………………………………………………………………………….12 
Drowing/Dimensions   ……………………………………………………………………………………….13 
Installation Report ...........................................................................................................................14
 

Dealer, Name and Address ............................................................................................................14 
Measured and Installed Settings  ...................................................................................................14 

 
Integral  part  of  documentation  of  eurofire  BIG  burner  is  TM3007  User  Manual  -  MPU  Control  Unit  
Instruction. 
 
 

 

Ekosystem AB reserves the right to make modifications to its equipment at any time

 

 

Summary of Contents for eurofire XL-GRYM

Page 1: ...Datum 080708 rev 0 eurofire XL GRYM 500 700 kW The Pellet Burner of the 21 st Century Ekosystem AB Bj rkev gen 84 S 805 97 G VLE Sweden...

Page 2: ...Chamber 8 Photocell 8 Setting the Thermostats 8 Pellets Priming Measure 8 Start and Stopp the Burner 8 Fuel Quantity and Pellets Travel Time to the Burner 9 Adjustment of Air Supply to the Burner 9 Ma...

Page 3: ...n This guarantee does not cover direct or indirect injuries to third parties or damage to property Cost of labour for replacement of components is not included in the guarantee Ekosystem AB will excha...

Page 4: ...r than 45 Fill up with pellets enough to cover the feed screw inlet properly Connect the screw to a power point and run it until it is completely filled with pellets Design and internal structure The...

Page 5: ...ney draught of 15 30 Pa is sufficient to run the burner at optimum If the internal area of the chimney is too large to allow 15 30 Pa a draught stabilizer can be installed to decrease the flue area If...

Page 6: ...6 Construction of the burner Hood Secondary Air Supply Internal Feed Screw Burner Cassette Primary Air Supply Igniters...

Page 7: ...trol Cabel Internal Feed Screw Motor Sprinkler Feed Tube Clamp Sprinkler s termosensor Secondary Air Supply Fan Internal Feed Screw Electric Box Primary Air Supply Fan Service Inlet Overheating termos...

Page 8: ...s own internal temperature gauge and regulator that controls and adjusts the burner It can be operated by setting the wanted output temperature within which the burner will operate see TM3007 User Man...

Page 9: ...from the amount of pellets delivered Boiler Efficiency Table 1kg pellets 4 8kWh Actual Energy Supply Pellets in gram weight per 3 minutes kg per hour Approx volume Pellets in decilitres per 3 min Ind...

Page 10: ...protection system is placed on the fall tube In the event of the alarm being triggered always investigate the cause and rectify Cause for an alarm may be a closed damper blocked convection tube not en...

Page 11: ...burner this reduces the number of start ups and saves fuel The regulator s gauge displays the current boiler temperature in the display panel of the boiler s MPU Controll Unit Ensure the immersion te...

Page 12: ...Pellets recomendation Diameter mm 6 8 Max length mm 32 The eurofire pellets burner including its control unit and feed screw system is CE certified and is manufactured and documented to the following...

Page 13: ...13 Drowing Dimensions...

Page 14: ...tailer Company Name Consultant Name Address Postal code Contact person Telephone Cell Fax E mail Type Output Manufacturers number Date of Manufacturer Measured and Installed Settings Date CO ppm CO2 F...

Reviews: