INSTALLATION
NP-DK50 2V 50, 2x2V 110-AD-A-1_03-2022
44
03/2022
Fig. 21: DK50 2x2V/110S/M cabinet clamps
Connect the earthing conductor to the door and install the door on the cabinet and secure with
4 screws.
14. COMMISSIONING
Make sure all transport stabilizers were removed.
Check that all compressed air hose connections are correct (see chap. 11).
Check correct connection to the mains (see chap. 12).
Check the circuit breaker position, it must be in the “I” position. If the main switch (2) is in the
“0” position, turn it to the “I” position.(Fig. 22).
For cabinet-mounted compressors, turn the main switch (4) on the front side of the cabinet into
the "I" position; a green indicator indicates the equipment is in operation. (Fig. 22).
Check connection of the cabinet connector to the compressor (Fig. 13).
Check connection of the cabinet manometer hose to the pneumatic block of the compressor
Check to ensure the hose from the automatic condensate drain is connected to the collection
vessel (Obr. 10).
Configuring the language on the dryer display (see chap. 19.2)
Configuring the date and time on the dryer display (see chap. 19.3)
Check the drying mode settings (see chap. 19.4)
The compressor is not equipped with a backup power supply.
Summary of Contents for DK50 2V/50/M
Page 1: ...N VOD NA POU ITIE SK USER MANUAL EN BENUTZERHANDBUCH DE...
Page 2: ......
Page 4: ...CONTENTS 5 INHALT 76 OBSAH 146...
Page 18: ...PRODUCT DESCRIPTION NP DK50 2V 50 2x2V 110 AD A 1_03 2022 18 03 2022 B DK50 2x2V 110S M...
Page 89: ...PRODUKTBESCHREIBUNG 03 2022 89 NP DK50 2V 50 2x2V 110 AD A 1_03 2022 B DK50 2x2V 110S M...
Page 158: ...POPIS V ROBKU NP DK50 2V 50 2x2V 110 AD A 1_03 2022 158 03 2022 Obr 4 Skrinka A DK50 2V 50S M...
Page 159: ...POPIS V ROBKU 03 2022 159 NP DK50 2V 50 2x2V 110 AD A 1_03 2022 B DK50 2x2V 110S M...
Page 218: ......
Page 219: ......
Page 220: ...NP DK50 2V 50 2x2V 110 AD A 1_03 2022 112000519 000...