EKO INSTRUMENTS CO., LTD. Ventilation Unit MV-01 Instruction Manual Ver. 4
Pg. 11
5 - 2 . I n s t a l l a t i o n
1. Installing pyranometer, pyrgeometer on MV-01
(1) Remove the two leveling screws and fixed foot attached to the lower part of the solar radiation sensor,
and attach it to the lower part (screw hole) of the MV-01.
(2) Pass the provided fixing bolts (M5 x 10 mm 2pcs) through the fixing holes (2 places) of the solar radiation
sensor. * Please be careful not to mistake the place which passes the fixing bolt
(3) With the s
olar radiation sensor’s cable connector and the MV-01 cable connector facing in the same
direction, place it on the center of the MV-01 from above.
Securely fix the fixing bolt, which has been passed through the fixing hole of the solar radiation sensor, to
the MV-01 using the supplied hex wrench.
(4) Adjust the level with the leveling screws while checking the level of the solar radiation sensor.
If installing on an inclined surface, adjust the level on the horizontal surface first, and then install on an
inclined surface.
(5) Please fix MV-01 to the installation stand with the main body fixing bolt (each 2: M6 x 100 mm, washer,
nut).
(6) Connect the cable of this product and solar radiation sensor to each connector.
(7) Finally, cover the hood from above and secure it by turning the knurled screw.
Figure 5-2. Installing the solar radiation sensor on MV-01
Leveling screws, Fixed foot
(1)
’
(1)
Fixing bolt (M5x10mm x2
)
(2)
(3)
(4)
(5)
(6)
(7)
⑦