Technical Information • PCZ-NVM • CPU Expansion Side Card
EMC Recommendations
In order to comply with the CE regulations for EMC, it is mandatory to observe the following rules:
C
The chassis or rack including other boards in use must comply entirely with CE
C
Close all board slots not in use with a blind front panel
C
Front panels must be fastened by built-in screws
C
Cover any unused front panel mounted connector with a shielding cap
C
External communications cable assemblies must be shielded (shield connected only at one
end of the cable)
C
Use ferrite beads for cabling wherever appropriate
C
Some connectors may require additional isolating parts
© EKF -19- ekf.com