Summary of Contents for Vector FTW3 RTX 3080

Page 1: ...USER GUIDE GPU WATER BLOCK EK Quantum Vector FTW3 RTX 3080 3090...

Page 2: ...card circuit board PCB The EK Fittings require only a small amount of force to screw them firmly in place since the liquid seal is ensured by the rubber O ring gaskets The use of corrosion inhibiting...

Page 3: ...HERMAL PADS 8 APPLYING THERMAL COMPOUND 9 INSTALLING THE WATER BLOCK 9 PLACING THE BLOCK ON THE GRAPHICS CARD 9 ATTACHING THE BLOCK TO THE GRAPHICS CARD 10 ATTACHING THE I O BRACKET 10 CHECKING FOR CO...

Page 4: ...2 5x6 AX1 Screw 13 pcs Allen Key 2 5 mm 1 pc Thermal Pad F 1 0 mm 4 pcs Thermal Grease 1 pc M2 5x8 AX1 Screw 2 pcs M2 5x4 AX1 Screw 20 pcs EK Quantum Vector FTW3 RTX 3080 3090 PVC Washer M2 5 20 pcs 1...

Page 5: ...5 WATER BLOCK DIMENSIONS 313 60 mm 194 13 mm 223 13 mm 154 50 mm 139 20 mm 20 45 mm 18 55 mm...

Page 6: ...cetal 8 D RGB Connector Standard 3 Pin 5V Data Blocked Ground PLEXI INSERT SCREW M4x8 DIN7984 MAIN O RING 140x2mm TERMINAL O RING 15x1 TERMINAL SCREW M4X20 DIN7984 TERMINAL COVER TERMINAL COVER LED PA...

Page 7: ...and disconnect the four cables connecting the stock cooler to the PCB Always remove the stock cooler slowly and with uniform force it might be firmly glued to the PCB with thermal pads STEP 2 CLEANIN...

Page 8: ...the thermal pad before installation Replacement thermal pads 5x Thermal Pad F 1 0mm 120X16mm EAN 3830046996732 STEP 1 Thermal Pad F 1 0 mm 120 x 16 mm CUTTING AND PLACING THERMAL PADS 120mm 16 mm 1 mm...

Page 9: ...APPLYING THERMAL COMPOUND For this Step you will need INSTALLING THE WATER BLOCK STEP 1 PLACING THE BLOCK ON THE GRAPHICS CARD This procedure is the same for all full cover water blocks Carefully posi...

Page 10: ...x 4 AX1 16 pcs M2 5 x 6 AX1 2 pcs Phillips Head Screwdriver Phillips Head Screwdriver 4 mm 6 mm STEP 2 M2 5 x 4 AX1 SCREW M2 5 PVC WASHER STEP 2 ATTACHING THE BLOCK TO THE GRAPHICS CARD Use sixteen 16...

Page 11: ...ry manipulation of the water block assembly that might damage your card or water block CHECKING FOR CONTACT If necessary temporarily remove the water block to check for uniform surface contact between...

Page 12: ...strip or the header itself STEP 1 D RGB HEADER RGB HEADER STEP 1 Screw in two 2 G1 4 threaded male fittings Attach the liquid cooling tubes and connect the water block to the cooling loop Do not forg...

Page 13: ...e the coolant leaks fix the issue and repeat the testing process To prevent possible damage please ensure that all hardware is dry before the system is powered on TESTING THE LOOP STEP 1 If you want t...

Page 14: ...d assistance please contact https www ekwb com customer support EKWB d o o Pod lipami 18 1218 Komenda Slovenia EU EKWaterBlocks EKWaterBlocks ekwaterblocks ekwaterblocks EKWBofficial SUPPORT AND SERVI...

Reviews: