30
Check that the green light is on continuously to indicate
that mains power is present.
Frequent testing of the system is a requirement to
ensure its continued and safe operation. Guidelines and
best practices for testing are as follows:
1.
After the system is installed.
2.
Regularly (monthly testing is recommended).
3.
After prolonged absence from the dwelling (e.g. after
holiday period).
4.
After repair or servicing of any of the systems
elements or household electrical works.
5.
After renovations to the house.
To test an individual Alarm press and hold the test button
until the horn sounds and the green or red light flashes.
This will ensure that the sensor, electronics and sounder
are working.
To test the SmartLINK system, press and hold the test button on one of the Alarms. The blue
LED from the Ei3000MRF will illuminate for approximately 3.5 seconds. Continue to hold
the test button until all the Alarms in the system are sounding. This will take between 20
to 45 seconds depending on the number of Alarms and their locations in the system, e.g. a
system with 12 Alarms may take up to 45 seconds for all to sound. Release the test button
when the test is completed.
Summary of Contents for Ei3000 Series
Page 2: ...2 ...
Page 4: ...4 1 Introduction ...
Page 6: ...6 2 Installation and House Coding ...
Page 12: ...12 Pin Alignment Figure 5b Pin Alignment Figure 5c Figure 5a ...
Page 13: ...13 3 System Installations ...
Page 18: ...18 4 Additional Features ...
Page 22: ...22 5 Troubleshooting and Indicator summary tables ...
Page 29: ...29 6 Testing the System ...
Page 32: ...32 7 Interconnected CO Alarms and Smoke Alarms ...
Page 34: ...34 8 SmartLINK Troubleshooting ...
Page 36: ...36 9 Technical Specifications ...
Page 38: ...38 10 Guarantee ...
Page 40: ...40 11 Limitations of Radio Communications ...
Page 43: ...43 ...