background image

EHV GmbH • Entwicklung | Herstellung | Vertrieb • Hauptstraße 131 • 01744 Dippoldiswalde

5

CONSTRUCTION MANUAL

Kiln shell of the Kanuk® with hotplate

Step I

Push the hangers at the top and bottom 

into the first and last radiation tube.

The side panels will be clipped into the 

bottom hangers.

Step II

Fix the side panels with the accompanying

screws at the top hangers.

Self-closing door layout I

Remove the circlip of the door-fixing bolt. Now pull the bolt 

to the top and push it into the torsion spring. The medium

hanger of the spring will be fixed on the doorframe. The ends 

of the springs are to be fixed behind the door suspension. 

Now return the bolt to the primary position and fix it with the 

circlip. Please make sure to fix the door additionally during 

the entire process.

1.4. 1.4. Combustion air supply

The combustion air supply is sufficient for Kanuk® hot-air kilns up to a nominal

heating capacity of 27 kW, provided there is at least one door or

window to be opened. Furthermore, the room needs a cross-section of

at least 150 cm². The room must not fall below 4 m³ per kW of nominal

heating capacity.

Summary of Contents for Kanuk 3

Page 1: ...Kanuk 3 4 Classic with hotplate und Turbo 1 2 Manual Brilliantly simple simply brilliant...

Page 2: ...ring incidents safe decommissioning 2 8 Refilling 2 9 Bed of ashes 2 10 Cleaning 3 Guarantee 3 1 Guarantee Warranty 4 Kanuk Turbo additional information Thank you for choosing a Kanuk hot air kiln We...

Page 3: ...hotplate Kanuk Turbo 4 8 7 1 2 3 6 5 1 1 General requirements Structure and components of the Kanuk Kiln shell 1 Door with special Schott Robax glass 2 Door locking mechanism 3 Gas flue pipe 4 Ash cat...

Page 4: ...onstructionmanual accessories Ashcatchplate Remove the ash catch plate from its packaging and clip it into the bolt underneath the door from the top KilnshelloftheKanuk Classic StepI Push the hangers...

Page 5: ...e top and push it into the torsion spring The medium hanger of the spring will be fixed on the doorframe The ends of the springs are to be fixed behind the door suspension Now return the bolt to the p...

Page 6: ...te back Kanuk 3 Classic 80 cm 50 cm 80 cm 40 cm Kanuk 4 Classic 80 cm 55 cm 90 cm 40 cm Kanuk 3 with hotplate 80 cm 50 cm 80 cm 40 cm Kanuk 4 with hotplate 80 cm 55 cm 90 cm 40 cm forward from the sid...

Page 7: ...36 Minimal chimney draft in Pa 12 12 12 12 12 12 HP with hotplate Table 2 Combustion chamber performance data Kanuk model 3 Classic 4 Classic 3 HP 4 HP Turbo 1 Turbo 2 fuel consumption in kg h 7 8 6 7...

Page 8: ...ays sawdust coal coke or similar combustibles 2 2 UseofKanuk Kanuk hot air kilns may only be used with combustion chamber door closed All Kanuk hot air kilns can be fitted with a self closing door mec...

Page 9: ...up stackthefirewoodinapyramidoverscrewedpaperandcoveritinthin logs of wood Then start the fire After heating up fill up the Kanuk hot air kiln with logs according to chapter 2 1 Beforethefirstheating...

Page 10: ...indowimmediately tomakesurethatthereisenoughfreshairavailable 2 8 Refilling Open the primary air vent in the combustion chamber door and the se condary air vent in the rear wall and set the control va...

Page 11: ...ers get a two year guarantee In case of commercial use the gu arantee period is extended by 12 months Viewing panes and ceramic sealing cords are generally not included in the guarantee In case of dam...

Page 12: ...than 4 m per kW heat out put Chimneys Kanuk Turbo wood burning stoves don t need an own chimney The fire rating results from DIN 13384 part 1 2 and 3 with the triplet shown in table 1 Kanuk Turbo wood...

Page 13: ...the back of the Kanuk Turbo and it turns bet ween 1600 and 2000 m an hour The ventilator s power can be regulated stageless and it is possbile to con trol it additionnaly with the thermostat at the f...

Page 14: ...fol ded spiral seam pipe There is also the possibility to use pipe bends T pieces Y pieces or similar connection pieces to forward the warm air Connection diameter Kanuk Turbo 1 315 mm diameter Kanuk...

Page 15: ...EHV GmbH Entwicklung Herstellung Vertrieb Hauptstra e 131 01744 Dippoldiswalde 15...

Page 16: ...GmbH Entwicklung Herstellung Vertrieb Hauptstra e 131 01744 Dippoldiswalde 16 EHV GmbH Entwicklung Herstellung Vertrieb Hauptstra e 131 01744 Dippoldiswalde EHV GmbH Hauptstra e 131 01744 Dippoldiswa...