![EHRLE KD 2x2 Series Operator'S Manual Download Page 38](http://html1.mh-extra.com/html/ehrle/kd-2x2-series/kd-2x2-series_operators-manual_2368759038.webp)
301801 • 1/2021 • H.S.
38 of 48
Operating Instruction
High Pressure Cleaner cold water, mobile
Series 2x2
8 Maintenance
8
Maintenance
WARNING
Carry out maintenance measures professionally.
Maintenance measures may only be carried out by authorised personnel
(see Tab. 8-1)
Before carrying out any maintenance work, take the high pressure cleaner
out of operation and disconnect it from the building‘s electrical power supply
or from the mains junction box (e.g. on construction sites).
8.1
General Information
The maintenance measures must be carried out professionally, regularly and
mean for the device:
●
Guarantee of operational safety.
●
Achieving a long service life.
●
Maintaining the performance.
8.2
EHRLE Maintenance and Inspection Contract
With the sale of the high pressure cleaner the manufacturer EHRLE offers a
maintenance contract or especially a safety inspection agreement. The main-
tenance contract includes:
●
Maintenance and repair work
●
Security inspection agreement.
The security inspection agreement includes the inspection according to
●
Guidelines for Liquid Sprayers (see Section 2.7).
8.3
Maintenance work
Components which show increased wear or whose design duration has been
exceeded or is exceeded before the next maintenance must be replaced as a
precaution.
Replace defective parts. Only use spare parts recommended and approved by
the manufacturer.
The following table contains the periodical maintenance work for the High
Pressure Cleaner cold water, mobile - Series 2x2.