STEP 3
A:
Attach the
Left Swing Tube (6L)
to the shaft on
Handlebar Post (2)
with
Hex Screw (24)
,
Spring Washer (52)
,
Flat Washer (25)
,
Wave Washer (54)
and
Long Axle (27)
. Don’t tighten them yet.
B: Attach the
Left Pedal Support (5L)
to the
Crank (22)
with
Left Pedal Bolt
(38L)
,
Wave Washer (45)
. Then fix
Spring Washer (41)
and the
Left Nylon
Nut (42L)
. Don’t tighten them yet.
C: Connect the
Left Swing Tube (6L)
and
Left Pedal Support (5L)
with
Hex
Screw (30)
,
Flat Washer (31)
and
Nylon Nut (32)
. Now tighten
Hex Screw
(24,30)
and
Left Nylon Nut (42L)
and then cover
with Caps (23), (57), (43)
and (36)
.
D: Fix
Right Pedal Support (5R)
and
Right Swing Tube (6R)
to the
Crank (22)
and axle of
Handlebar Post (2)
in the same way.
E: Attach the
Pedal (10L/R)
to the
Pedal Support (5L/R)
with
Hex Bolt (33)
,
Flat Washer (34)
and
Nylon Nut (35)
. Tighten all screws and nuts.
7
Summary of Contents for E006
Page 3: ...EXPLODED DIAGRAM 2...