
UPS RMH700/1000/1500
Instruction Manual
RMH Series
Page 27 of 37
9.2.3 Activating the test operation
Before activating the test operation, you must observe the following points:
o
Inform all employees involved about your intended action.
o
As a safety precaution, back up all the data of your connected consumer
loads.
o
Leave all consumer loads switched on so that the load characteristic
remains unchanged.
o
Ensure that the UPS is in mains power operating mode.
Briefly press the "ON/OFF“ button (touch only).
The UPS then switches to test operation for approximately 10 seconds.
This operating mode is only used to test the function of the UPS.
At this stage, the battery capacity indicator only provides an indication of the
battery pack charge status. This does not necessarily reflect the total capacity
of the battery pack or the overall support time it can provide.
9.2.4 Communication
For the data exchange between the UPS and a parent system, appropriate
software packages are required. The range of products can be found in the
"Software" chapter.