SWL Pre-Delivery Check List
Page 1
Revision A
PRE-DELIVERY CHECK LIST
INSPECTOR’S INFORMATION
Inspected By:
Signature:
Distributor:
Date Installed:
Customer:
Date Inspected:
I. COMPONENT INFORMATION
Hoist Model:
Hoist Serial No.:
Chassis VIN:
Chassis Make & Model:
Chassis GVWR:
Chassis CA / CT:
Distance from rear of cab to the centerline
of rear axle/tandem.
After Frame:
Distance from centerline of rear
axle/tandem to rear of hoist.
PTO Make:
PTO Model:
PTO Serial No.:
PTO % of Engine RPM:
Hyd. Pump Make:
Hyd. Pump Model:
Hyd. Pump Serial No.:
II. INSTALLATION TO CHASSIS
Were there any problems installing the hoist to the truck chassis?
YES
NO
If yes, please describe:
All bolts checked for proper tightness.
Please include photos of the hoist installed on the truck chassis. Be sure to include at least one photo
from each side of the chassis/hoist.
Summary of Contents for SWAPLOADER SL-145
Page 1: ...Model SL 145 Parts and Operations Manual Hoist Serial Number ____________________...
Page 7: ...INTRODUCTION...
Page 14: ...INTRODUCTION 1 7 09 2009 90P52 PROP DECAL OPTIONAL 90P78 HIGH PRESSURE FLUID...
Page 15: ...INSTALLATION...
Page 38: ......
Page 39: ......
Page 42: ...Page 3 of 7 28JUL09...
Page 43: ...Page 4 of 7 28JUL09...
Page 44: ...Page 5 of 7 28JUL09...
Page 45: ...Page 6 of 7 28JUL09...
Page 46: ...Page 7 of 7 28JUL09...
Page 49: ......
Page 50: ......
Page 51: ...10 05 09 REAR LIGHT BAR ASSEMBLY 51H68...
Page 54: ...10 05 09...
Page 55: ......
Page 56: ......
Page 57: ......
Page 58: ......
Page 61: ...OPERATION...
Page 66: ...MAINTENANCE...
Page 68: ...SL 145 MAI 4 2 07 2009...
Page 80: ...PARTS LIST...
Page 81: ...11H80 REV B SL 145 SWAPLOADER HOIST BASE ASS Y 2 1 5 2 3 3 1...
Page 83: ......
Page 84: ......
Page 92: ...OPTIONS...
Page 95: ...HOIST INSTALLATION KIT EHV SL 145 12H80...
Page 96: ...EHV SUB ASS Y PUMP CIRCUIT 100 SERIES 91H22...
Page 97: ...EHV SUB ASS Y CHASSIS TANK CIRCUIT 100 SERIES 91H23...
Page 98: ...EHV SUB ASS Y VALVE HOSE CIRCUIT SL 145 91H25 REV A...