3
I-3.
LED Status
II.
Installation
Read the following below procedures in the correct order. Incorrect
installation may cause damage to the product.
II-1.
Physically Setup
There are two ways to physically set up the switch.
1.
Desktop Placement
: Place
the switch on a flat surface
and install the four rubber
feet (included) on the
bottom of the switch.
Function
Color
Status
Description
PWR
Green
On
Power on
Off
Power off
Blinking
Booting up
PoE Alert
Green
On
Total PoE power consumed is
OVER
PoE power budget
Off
Total PoE power consumed is
under PoE power budget
Link/ACT
(Port 1-9)
Green
On
Link at 1000Mbps
Blinking
Sending or receiving data
Off
Port disconnected or link fail
Amber
On
Link at 10/100Mbps
Blinking
Sending or receiving data
Off
Port disconnected or link fail
SPF
(Port 10)
Green
On
Link at 1000Mbps
Blinking
Sending or receiving data
Off
Port disconnected or link fail
PoE
(Port 1-8)
Green
On
Feeding power to PoE devices
Off
PoE function is not active