
16
ENGLISH
INSTALLATION
fig. 4
A
F
D
fig. 6
B
C
Fig. 2
M
N
Fig. 1
Fig. 3
fig. 5
D
fig. 7
E
E
ADAPTATION FOR PNEUMATIC PELLET
LOADING SYSTEM (optional)
The boiler is designed for pellet loading by means of a
pneumatic feeding system.
The user must activate loading manually.
To install the system, proceed as follows:
N.B.:
before starting, turn the boiler off and discon-
nect the electricity supply wire.
Fig. 4:
Remove the steel cover (A) by dismantling the two hinges
(B) and the compass type rod (C).
Fig. 5-6:
Position the plate (D), contained in the system packaging
and fix it with three screws (E) provided.
Fig. 7:
The external unit for drawing pellets must be fixed to the
plate (D) (see system technical diagram).
ADAPTATION FOR PELLET LOADING SCREW
SYSTEM (optional)
The boiler is designed for pellet loading by means of a
screw feeding system.
ATTENTION: the boiler must be positioned
at least 30 cm from the wall behind it
To install the system, proceed as follows:
N.B.:
before starting, turn the boiler off and di-
sconnect the electricity supply wire.
Fig 1 - 2
• Remove the cover screwed onto the back of the boiler
(fig. 1), and replace it with the flexible pipe connection
flange contained in the system packaging (M -fig. 2).
• The flexible pellet feeding pipe must be connected to
the flange (N) (see system technical diagram).
Fig 3
• Insert the level sensor in the special seat on the rear
of the boiler, removing the cap fixed with two screws.