28
IT
ALIANO
INSTALLER
CERAMIC CLADDING
Levelling feet
The product is equipped with feet that
can be adjusted with a screwdriver from
inside the product BEFORE mounting the
claddings.
BEFORE INSTALLING THE
CLADDING, SECURE THE
PRODUCT TO THE WALL WITH
THE BRACKETS PROVIDED TO
MAKE SURE IT DOES NOT TIP
OVER.
The above-mentioned elements, once they have been
The above-mentioned elements, once they have been
mounted, will be positioned as shown in the adjacent
mounted, will be positioned as shown in the adjacent
figure.
figure.
The mounting operations are described in the figures
The mounting operations are described in the figures
appearing on the following pages.
appearing on the following pages.
1
“Right” and “left” refer to the product when viewed from the front.
“Right” and “left” refer to the product when viewed from the front.
2
3
4
A
5
The Blade H ceramic cladding is divided as shown below:
The Blade H ceramic cladding is divided as shown below:
• a box with the metal parts (A), indicated in the table below (3-4-5-6);
• two boxes (B)-(C) strapped together each containing a ceramic side panel.
Description
Reference in the figures below
Quantity
Right-hand ceramic side panel
(1)
1
Left-hand side panel
(2)
1
Steel top front panel
(3)
1
Steel bottom front panel
(4)
1
Aesthetic top edge
(5)
1
Filler profile between the top and
bottom front panels made of steel
(6)
1
Small hardware
B
C
The position of each ceramic side panel is engraved
on the inside of the panel (S = left; D = right)
6