– 1 –
Quick Start Guide
E072020-MR-R01
150200002243A
48-Port Ethernet Switch
AS4630-54PE
1.
AS4630-54PE Ethernet Switch
2.
Rack mounting kit—2 brackets and 8 screws
3.
2 x Power cord
4.
Console cable—RJ-45 to D-Sub
5.
Documentation—
Quick Start Guide
(this document) and
Safety
and Regulatory Information
1.
1x USB port
2.
1 x Management port
3.
1 x Serial console port
4.
System buttons/LEDs
5.
48 x RJ45 1G PoE ports
6.
4 x SFP28 25G ports
7.
2 x QSFP28 40G/100G uplink or stacking ports
8.
3 x Fan trays
9.
2 x AC PSUs
8
1
9
7
6
5
2
3
4
Package Contents
Overview
FRU Replacement
Airflow Reversal
STK M/S button
Reset button
System LED:
Green (OK), Amber (fault)
PRI LED:
Green (primary unit), Amber (secondary unit)
PSU LEDs:
Green (OK), Amber (fault)
STK LEDs:
Green (stacking ports active)
FAN LED:
Green (OK), Amber (fault)
PoE LED:
Green (OK), Amber (High PoE load)
RJ-45 Port LEDs:
Green (link), Amber (link with PoE), Blinking (activity)
SFP28 Port LEDs:
White (25G), Green (10G), Blinking (activity)
QSFP28 Port LEDs:
White (100G), Green (40G link), Blinking (activity)
PSU Status LED:
Green (OK), Red (fault or fan failure)
Fan Tray Status LED:
Green (OK), Red (fault)
System Buttons/LEDs
Port/FRU LEDs
1
2
3
4
5
2. B2F Airflow
Install back-to-front (B2F) airflow
fan trays (blue handles) and PSUs
(blue release latches).
Fan Tray Replacement
1.
Loosen the fan tray screw.
2.
Remove fan tray from the
chassis.
3.
Install replacement fan with
matching airflow direction.
PSU Replacement
1.
Remove the power cord.
2.
Press the release latch and
remove the PSU.
3.
Install replacement PSU with
matching airflow direction.
1. F2B Airflow
Remove front-to-back (F2B)
airflow fan trays (red handles) and
PSUs (red release latches).
*150200002243A_R01*
www.edge-core.com