TM
1
FrameSaver
SLV NNI
Installation Instructions
Document Number 9024-A2-GN11-01
September 1998
If you ordered a wall mounting kit (Feature No. 9001-F1-891) for your 1-slot
FrameSaver SLV (service level verifier) NNI (network-to-network interface) unit, install
the wall mounting before you start installing the unit.
Contact your sales representative to order this feature.
Before You Begin
Make sure you have:
A dedicated, grounded power outlet that is protected by a circuit breaker within
6 feet of the FrameSaver SLV NNI unit.
A clean, well-lit, and ventilated site that is free from environmental extremes.
One to two feet of clearance for cable connections.
A physical T1 connection to the frame relay network.
An async (asynchronous) terminal or PC (personal computer) to set up the
FrameSaver NNI unit.
Node IP Addresses and Subnet Masks. See your network administrator for this
information.
The DLCI (data link connection identifier) for each end of the PVC (permanent
virtual circuit), provided when the frame relay service was purchased.
A frame relay switch that supports V.35.