background image

TM

 1

FrameSaver

 SLV NNI

Installation Instructions

Document Number 9024-A2-GN11-01

September 1998

If you ordered a wall mounting kit (Feature No. 9001-F1-891) for your 1-slot
FrameSaver SLV (service level verifier) NNI (network-to-network interface) unit, install
the wall mounting before you start installing the unit.

Contact your sales representative to order this feature.

Before You Begin

Make sure you have:

A dedicated, grounded power outlet that is protected by a circuit breaker within
6 feet of the FrameSaver SLV NNI unit.

A clean, well-lit, and ventilated site that is free from environmental extremes.

One to two feet of clearance for cable connections.

A physical T1 connection to the frame relay network.

An async (asynchronous) terminal or PC (personal computer) to set up the
FrameSaver NNI unit.

Node IP Addresses and Subnet Masks. See your network administrator for this
information.

The DLCI (data link connection identifier) for each end of the PVC (permanent
virtual circuit), provided when the frame relay service was purchased.

A frame relay switch that supports V.35.

Summary of Contents for FrameSaver SLV NNI

Page 1: ...utlet that is protected by a circuit breaker within 6 feet of the FrameSaver SLV NNI unit A clean well lit and ventilated site that is free from environmental extremes One to two feet of clearance for...

Page 2: ...not install your cables until instructed to do so Package Checklist Verify that your package contains the following 1 Slot FrameSaver SLV NNI unit Power cord with desktop 120 Vac power transformer Un...

Page 3: ...ine interface cable RJ48C to CA81A 3100 F1 510 LAN Customer converter with a DB25 plug on one end and an 8 pin modular jack on the other end with a custom 8 conductor cable and LAN adapter 3100 F2 910...

Page 4: ...s securely into the jack POWER COM NETWORK DSX 1 98 16122 Power Supply Cord Grounded Power Outlet Locking Tab POWER COM O K A L M 2 Insert the socket end of the power cord into the power supply s rece...

Page 5: ...he FrameSaver NNI unit s COM port 98 15824 POWER COM NETWORK DSX 1 To Connect to a PC or Async Terminal COM Port FrameSaver 9124 Shown 3 Insert the other end of the cable into the VT100 compatible ter...

Page 6: ...t of the power supply An LED is not lit LED is burned out Run the Lamp Test If the LED in question does not flash with the other LEDs contact your sales or service representative Power Up Self Test fa...

Page 7: ...to go to the Configuration Edit Display menu so you can start setting up the unit 1 From the Main Menu press the down arrow or Tab key twice so the cursor is on Configuration 2 Press Enter to display...

Page 8: ...efore starting to configure the FrameSaver NNI unit confirm that the unit passed the self test 1 Follow this menu selection sequence from the Main Menu pressing Enter after each selection Main Menu St...

Page 9: ...ptions from the Configuration Edit Display menu Configuration Current Configuration Management and Communication Communication Protocol 2 Minimally enter the following options Node IP Address Node Sub...

Page 10: ...ff If yes the network interface is set up correctly and is operational If no check that both ends of the network cable are properly seated 2 Check Health and Status messages in the left column of the...

Page 11: ...S trap manager SNMP Traps set to Enable Number of Trap Managers NMS n IP Address n being the first second third etc trap manager entered 3 Press Ctrl a to move the cursor to the bottom of the screen 4...

Page 12: ...The Modify DLCI Record for DLCI Number prompt will appear 3 Select the DLCI that will be used by pressing the spacebar until the correct DLCI number appears then press Enter 4 With the cursor on the D...

Page 13: ...enu Test IP Ping 2 Enter the IP Address of the device being pinged then select Start NOTE When running tests the cursor is positioned over the Start command Press Enter to start the test Stop is displ...

Page 14: ...er NNI unit into PVC Loopback taking frames from the PVC and looping them back Main Menu Test Network PVC Tests Interior PVC Loopback 4 On the other FrameSaver NNI unit send a pattern over the network...

Page 15: ...that both ends of the V 35 cable are properly seated and secured 2 Check Health and Status messages in the left column of the System and Test Status screen for messages Main Menu Status System and Te...

Page 16: ...me Relay Link statistics are incrementing and there are no errors under the Frame Relay LMI statistics Type r for Refresh and press Enter to update the counts that are displayed If data is being recei...

Page 17: ...onnections and replace or repair a damaged cable Check that the endpoint unit is installed 3 Press the spacebar to cycle through the DLCIs passing through the FrameSaver NNI unit All the appropriate D...

Page 18: ...ve humidity Shock and vibration 32 F to 122 F 0 C to 50 C 4 F to 158 F 20 C to 70 C 5 to 85 noncondensing Withstands normal shipping and handling Approvals FCC Part 15 FCC Part 68 Industry Canada Safe...

Page 19: ...B8ZS 0 0 dB 7 5 dB 15 dB 22 5 dB Selectable FCC Part 68 AT T TR 62411 Selectable Port 1 DTE Synchronous Data Ports Standard Data rates 34 position V 35 connector V 35 ITU ISO 2593 All fractional T1 ra...

Page 20: ...Telephone Call our automated call system to receive current information via fax or to speak with a company representative Within the U S A call 1 800 870 2221 Outside the U S A call 1 727 530 2340 Doc...

Reviews: