15
Connecting to the IEC/IXC
1. Connect one end of the V.35 cable to Port 1.
2. Plug the other end of the cable into the IEC/IXC equipment.
3. Tighten the screws on each side of the connector to secure it.
POWER
COM
NETWORK
DSX-1
98-16121
IEC/IXC
Verification Check:
1. Is the Port OK LED on?
— If yes, the port is set up correctly and is operational.
— If no, check that both ends of the V.35 cable are properly seated and secured.
2. Check Health and Status messages in the left column of the System and Test
Status screen for messages.
Main Menu
→
Status
→
System and Test Status
— If System Operational appears, the Port-1 interface is set up correctly and
is operational.
— If System Operational does not appear, refer to the status information in
Chapter 11,
Displaying System Information, of the User’s Guide.
NOTE:
When any error conditions are detected, a status message will appear along
the bottom right corner of the screen.