background image

 

Spectrum 90

™ Camera 

 

Document: UMAD007298.docm  

Revision: A10 

Created by: KJB 

Date: 27 Sep 2019 

IPN: 3041348-A10  

Source Location: C:\ePDM\ISLEng\products\ad-spectrum90\manuals\UMAD007298.docm

 

 

Page 11 of 19 

 

User Ma

nual

 

 

FIGURE 4:  ANODE ATTACHMENT 

Connector Handling 

Connectors are an essential part of system reliability. They should be properly maintained and cared for 
to ensure long life and reliability. It is recommended to follow these steps to help prevent damage and 
increase the life of connectors.  

 

Always put the cap back on the tether bulkhead when the tether is disconnected 

 

Always inspect the end of the connector prior to engaging 

 

Never plug in a dirty or damaged connector 

 

Visually align key-ways or locating pins prior to engaging the connector 

 

Always fully engage or tighten the connector 

 

Secure locking collars finger tight 

 

Install dummy plugs on unused connectors 

 

Disconnect by pulling straight, not on an angle 

 

Do not pull on the cable to disengage the connector 
 

IMPORTANT: 

Never “Hot Plug” any connector, this will result in internal damage to the 

electronics. Power down the system prior to connecting the inspection system tether. 

Note:

  Never use WD-40 or similar solvent-based fluids on connectors or crawlers. These will cause 

the rubber parts of the connector or crawler to soften and swell rendering them inoperable.  

 

Summary of Contents for INUKTUN SPECTRUM 90

Page 1: ...2569 Kenworth Road Suite C Nanaimo BC V9T 3M4 CANADA 1 250 729 8080 info eddyfitechnologies com www eddyfitechnologies com INUKTUN SPECTRUM 90...

Page 2: ...ut 6 Laser Lines 6 Safety 7 System Setup 8 Unpacking Components 8 Mounting the Camera 9 Galvanic Corrosion Control 10 Connector Handling 11 SubConn Connector Lubrication and Cleaning 11 Attaching the...

Page 3: ...LEng products ad spectrum90 manuals UMAD007298 docm Page 3 of 19 User Manual Rinsing and Cleaning 16 Inclinometer Calibration 16 Factory Maintenance 17 Parts and Repairs 17 Ordering Parts Customer Ser...

Page 4: ...of any changes to their equipment Information in this manual does not necessarily replace specific regulations codes standards or requirements of others such as government regulations This manual copy...

Page 5: ...Dimensions Standard 90 x 273 mm 3 5 x 10 8 in Deep Water 90 x 298 mm 3 5 x 11 7 in Weight Aluminum 2 8 kg 6 1 lb Stainless Steel 5 5 kg 12 2 lb Imager Sensor 1 2 8in Exmor R CMOS NTSC or PAL Lens f 5...

Page 6: ...shown for the Bulkhead Connector on the camera Pin Function 1 70 VDC GND 2 70 VDC 3 RS485A 4 RS485B 5 SpareA 6 SpareB 7 Video1 8 Video1 FIGURE 1 CONNECTOR PIN OUT Laser Lines The Spectrum 90 camera m...

Page 7: ...upplied to the product must have reinforced isolation from the mains with no reference to earth ground WARNING Spark Hazard Under no circumstances should this equipment be used in a potentially explos...

Page 8: ...ervicing the product CAUTION Do not over pressure the camera through the Schrader valve Applying pressure beyond 15 psi through the Schrader valve may cause the camera to burst resulting in injury and...

Page 9: ...e Use M6x1 SS SHCS The length of the screws will depend on the thickness of the mounting bracket Refer to the figures below The camera may be mounted in any orientation as the camera has continuous pa...

Page 10: ...mmon in the marine industry and are replacing zinc anodes in many areas For cameras systems that are often pulled in and out of the water aluminum anodes are especially important as zinc anodes tend t...

Page 11: ...isconnected Always inspect the end of the connector prior to engaging Never plug in a dirty or damaged connector Visually align key ways or locating pins prior to engaging the connector Always fully e...

Page 12: ...al cleaning and removal of sand or mud on a connector should be performed using a spray based contact cleaner like isopropyl alcohol Attaching the Drop Cone Assembly Optional A drop cone assembly shou...

Page 13: ...chrader valve components will be forced open below 40 m 130 ft depth by the water pressure FIGURE 7 DEPTH RATED SCHRADER VALVE ASSEMBLY Nitrogen Purge and Pressurization The Spectrum 90 camera has bee...

Page 14: ...re than 10 psi pressure FIGURE 8 SCHRADER VALVE CAP AND PURGING SEAL SCREW LOCATION Operation Camera control Refer to the ICON Suite manual for camera controlling instructions This manual will cover c...

Page 15: ...camera cable for cuts nicks or kinks Store the camera in its rugged case with the connector sufficiently protected Troubleshooting Camera Control Problems 1 Not all the auxiliary lights are on The IC...

Page 16: ...r Re termination Tether termination is a specialized service beyond the scope of this manual Contact Eddyfi Technologies if the tether is damaged or requires re termination Rinsing and Cleaning After...

Page 17: ...re Parts and Repairs Ordering Parts Customer Service Some spare and or replacement parts are available for your product and can be ordered directly from your local office When ordering parts always ma...

Page 18: ...til the correct paperwork is completed If cross border shipments are not labelled as per the instructions the items may be held by customs and issued additional fees All returned items must be sent pr...

Page 19: ...ion to improperly wired AC receptacles 5 Track belts tethers view ports and other components subject to wear through abrasion are warranted to be free from defects in material and workmanship for a pe...

Reviews: