background image

Page 19

E-CPU10FC-I-1117

E-SPTS-I-0809

800-638-3326 • edcoinc.com • [email protected]

EQUIPMENT DEVELOPMENT CO., INC.

        

 

P

  A

A

   SA    

S   C

S

Equipment Development Company, Inc. herein referred to as EDCO (Seller) warrants that 

each new unit manufactured by EDCO to be free from defects in material and workmanship 
in normal use and service for a period of (1) one year (except for the cutter drum assembly 
on all model concrete/asphalt planes, in which case the warranty period shall be 90 days) 
from date of shipment to the original retail or equipment rental center owner.

Accessories or equipment furnished and installed on the product by EDCO but manufactured by 

others, including, but not limited to engines, motors,electrical components, transmissions etc., shall 
carry the accessory manufacturers own warranty.

EDCO will, at its option, repair or replace, at the EDCO factory or at a point designated by 

EDCO, any part which shall appear to the satisfaction of EDCO inspection to have been 
defective in material or workmanship.

EDCO  reserves  the  right  to  modify,  alter  and  improve  any  part  or  parts  

without incurring any obligation to replace any part or parts previously sold without such 
modified, altered or improved part or parts.

This warranty is in lieu of and excludes all other warranties, expressed, implied, statutory, 

or otherwise created under applicable law including, but not limited to the warranty of mer-
chantability and the warranty of fitness for a particular purpose in no event shall seller or 
the manufacturer of the product be liable for special, incidental, or consequential damages, 
including loss of profits, whether or not caused by or resulting from the negligence of seller 
and/or the manufacturer of the product unless specifically provided herein. In addition, this 
warranty shall not apply to any products or portions there of which have been subjected to 
abuse, misuse, improper installation, maintenance, or operation, electrical failure or abnormal 
conditions  and  to  products  which  have  been  tampered  with,  altered,  modified,  repaired, 
reworked by anyone not approved by seller or used in any manner inconsistent with the 
provisions of the above or any instructions or specifications provided with or for the product

FORCE MAJEURE

Seller’s obligation hereunder are subject to, and Seller shall not be held responsible for, any 

delay or failure to make delivery of all or any part of the Product due to labor difficulties, 
fires,  casualties,  accidents,  acts  of  the  elements,  acts  of  God,  transportation  difficulties, 
delays by a common carrier, inability to obtain Product, materials or components or qualified 
labor sufficient to timely perform part of or all of the obligations contained in these terms 
and conditions, governmental regulations or actions, strikes, damage to or destruction in 
whole or part of manufacturing plant, riots, terrorist attacks or incidents, civil commotions, 
warlike conditions, flood , tidal waves, typhoon, hurricane, earthquake, lightning, explosion 
or any other causes, contingencies or circumstances within or without the United States not 
subject to the Seller’s control which prevent or hinder the manufacture or delivery of the 
Products or make the fulfillment of these terms and conditions impracticable. In the event 
of the occurrence  of any of the foregoing, at the option of Seller, Seller shall be excused 
from the performance under these Terms and Conditions, or the performance of the Seller 
shall be correspondingly extended.

This document sets forth the terms and conditions pursuant to which the purchaser (“Pur-

chaser”) will purchase and Equipment Development Co.Inc. (“Seller”)will sell the products, 
accessories, attachments (collectively the Products “) ordered by the Purchaser. These terms 
and conditions shall govern and apply to the sale of Seller’s Products to Purchaser, regardless 
of any terms and conditions appearing on any purchase order or other forms submitted by 
Purchaser to Seller, or the inconsistency of any terms therein and herein. 

1. PRICE

 All prices set forth on any purchase order or other document are F.O.B. Sellers facility or distribution 

point, as may be determined by Seller  (F.O.B.Point). All prices are exclusive of any and all taxes, 
including, but not limited to, excise, sales, use, property or transportation taxes related to the sale or 
use of the Products, now or hereafter imposed, together with all penalties and expenses. Purchaser 
shall be responsible for collecting and/or paying any and all such taxes, whether or not they are 
stated in any invoice for the Products. Unless otherwise specified herein, all prices are exclusive 
of inland transportation, freight, insurance and other costs and expenses relating to the shipment 
of the Products from the F.O.B. point to Purchaser’s facility. Any prepayment by Seller of freight 
insurance and other costs shall be for the account of Purchaser 

and shall be repaid to Seller.

2. PAYMENT TERMS

  Payment  terms  are  as  follows.  2%  10  days  (to  approved  and  qualified  accounts).  Net  30  days. 

This is a cash discount for invoices paid within 10 days after the invoice date, regardless of date 
of receipt of shipment.  This is not a trade discount and will not be granted to accounts that do not 
adhere to stated terms.

 *All past due accounts are subject to a late payment fee of 1.5% per month or a maximum allowed 

by law if different, along with the expenses incidental to collection including reasonable attorney’s 
fees and costs.

 *Seller reserves the right to hold shipments against past due accounts.

 *Seller reserves the right to alter payment terms.

 3. FREIGHT TERMS
 All shipments will be made F.O.B. shipping point as designated in these Terms and Conditions, and 

title shall pass at the F.O.B. point.  Delivery to the initial common carrier shall constitute delivery to 
the Purchaser.  Any claims for loss or damage during shipment are to be filed with carrier by the 
Purchaser.  Seller will not assume responsibility for the performance of the carrier.

 Back orders will be shipped in the most practical fashion with charges consistent with our freight 

policy established with the original order. UPS, FED EX, MAIL or shipments by other couriers are 
subject to the same terms and conditions as outlined in paragraph #3”Freight Terms”. 

 4. DELIVERY, DAMAGES, SHORTAGES
 Seller shall use reasonable efforts to attempt to cause the Products to be delivered as provided for in these 

Terms & Conditions.  Delivery to the initial common carrier shall constitute the delivery to the Purchaser.  
Sellers responsibility, in so far as transportation risks are concerned ceases upon the delivery of the 
Products in good condition to such carrier at the F.O.B. point and all the Products shall be shipped at the 
Purchaser’s risk.  Seller shall not be responsible or liable for any loss of income and/or profits, or incidental, 
special, consequential damages resulting from Seller’s delayed performance in shipment and delivery.

 5. RETURN OF DEFECTIVE PRODUCTS
 Defective or failed material shall be held at the Purchaser’s premises until authorization has been 

granted by Seller to return or dispose of Products.  Products that are to be returned for final inspec-
tion must be returned Freight Prepaid in the most economical way.  Credit will be issued for material 
found to be defective upon Seller’s inspection based on prices at time of purchase.

 6. PRODUCTS ORDERED IN ERROR
 Products may be returned, provided that claim is made and Seller is notified within 7 days of receipt of 

Products, and the Products are in original buyer’s possession not more than 30 days prior to return, 
subject to Seller’s approval. If Products are accepted for return, they must be Freight Prepaid and 
buyer will be charged a minimum of 15% restocking charge, plus a charge back for outbound freight 
charges if the original order  was shipped prepaid. Returns are not accepted for any Products that 
are specifically manufactured to meet the buyer’s requirement of either specifications or quantity.

 AGREEMENTS
 These Terms and Conditions constitute the entire agreement between Seller and Purchaser as it relates to 

terms and conditions of sale, and supersedes any and all prior oral or written agreements, correspondence, 
quotations or understandings heretofore in force between the parties relating to the subject matter hereof.  
There are no agreements between Seller and Purchaser with respect to the Product herein except those 
specifically set forth in and made part of these terms and conditions.  Any additional terms, conditions 
and/or prices are rejected by Seller.

 These terms and conditions may be modified, cancelled or rescinded only by a written 
 agreement of both parties executed by  their duly authorized agents.

    USE ONLY GENUINE EDCO PARTS & ACCESSORIES

      

For your own safety, the safety of others and the life of your machine.

    

Summary of Contents for CPU-10FC

Page 1: ...f Propelled Concrete Asphalt Scarifier E CPU10FC I 1117 E SPTS I 0809 EQUIPMENT DEVELOPMENT CO INC EQUIPMENT DEVELOPMENT CO INC 100 Thomas Johnson Drive Frederick MD 21702 4600 USA Phone 301 638 3326 301 663 1600 Fax 800 447 3326 301 663 1607 edcoinc com sales edcoinc com ...

Page 2: ...n result in death or serious injury Indicates hazards which if not avoided could result in serious injury and or damage to the equipment Safety Instructions are proceeded by a graphic alert symbol of DANGER WARNING or CAUTION ELECTRICAL POWERED EQUIPMENT GASOLINE PROPANE POWERED EQUIPMENT Equipment should only be operated by trained personnel in good physical condition and mental health not fatigu...

Page 3: ... insure product safety and reliability always use genu ine EDCO replacement parts when making repairs to the equipment When ordering parts please specify the MODEL and SERIAL NUMBER of the machine as given on the NAME PLATE In addition give part number description and quantity as listed on the parts list Please note Due to improvements and changes in the equipment the illustrations shown may be di...

Page 4: ...of cut ting tool and the power behind the cutters What to Expect from your CP C C Concrete Scarifier Since the hardness of the surface cannot be changed and the cutter type is limited to present state of the art material and the power source is fixed there may be conditions that are beyond the capability of the scarifier To exceed these limits will only cause problems Cutter life will be shortened...

Page 5: ... lend or rent this equipment without including the Operator s Instruction Manual and the Engine Manufacturer s Manual Make sure all safety decals can be clearly read and understood Replace damaged or missing decals immediately For Electric Models Electric motor must be properly grounded at all times Check the outlet box to be sure the electrical service is properly grounded and that adequate power...

Page 6: ... Cutter Head Lever 2 Clutch Lever 3 Depth Control Knob 4 Lifting Eye 5 E Stop 6 Drive Control Lever 7 Handle Locking Knobs 8 Hour Meter 9 Water Hook Up 10 Fuel Lockoff Solenoid Toggle For Propane Models Only Not Shown 11 Ignition Switch Choke Throttle are located on Remote Control on Engine Figure 2 9 1 7 3 2 8 5 6 7 4 11 ...

Page 7: ...ed during operation Adjust the handles for operator comfort and safe operation Be sure to retighten knobs Figure 2 Item 9 Raise the cutter head to the full up position using the cutter head lever on the console Figure 2 item 1 Move the machine into operating position by disengaging the clutch Figure 2 item 2 Lower clutch lever when unit is in position DO NOT disengage clutch when engine is running...

Page 8: ...ving the lever forward away from the neutral position Depth of cut and hardness of material will determine the most efficient cutting speed Deep cutting requires slower forward speeds allow engine to run at full RPM during the cutting operation To Stop Cutting Move drive control lever to neutral raise cutter head assembly above slab surface For gasoline models close throttle and turn the ignition ...

Page 9: ...epth than those spaced at 1 2 centers and the planer will move forward faster Most of the material in the path of the cutting head will be removed either by the cutters them selves or through the natural hammering action and spalling of the material being cut A later pass with cutters spaced closer together will remove the ridges To Reach Maximum Depth in Concrete It is best to make several passes...

Page 10: ...er wheel assembly will follow the contour of the surface to be cut By doing this you can control the amount of surface to be removed with little or no damage beneath the paint Refer to the CPU 10FC Assembly Instructions booklet for suggested Cutter Drum setups Cutter Wheels Use only EDCO approved cutter wheels Cutter wheels for all application are available sizes and types vary Complete informatio...

Page 11: ...ters are free and cutting is being accomplished by hammering action only Failure to follow these instructions will cause undue cut ter wear breakage bearing failure or excessive vibration that will be transmitted back to the machine frame and engine eventually causing a virtual self destruction of the unit Outrigger Wheel Assembly Optional Figure 5 Figure 6 New CP 405 Cutter Wheel Uneven wear on c...

Page 12: ...tancy is esti mated at 10 years Refer to the Engine Manufacturer s Owner s Manual for maintenance information specific to the engine used Grease cutter assembly bearings 2 after every 4 hours of use IMPORTANT Grease Depth Control Bearing every 40 hours Check hydrostatic transmission fluid level after every 50 hours of operation If it is low fill to level mark with GM Dexron B or comparable fluid G...

Page 13: ...se New belts will be stiff and will loosen with use Proper belt tension must be maintained to transmit the engine power to the cutting drum Slipping belts will overheat the blade life will be shortened and the cutting speed lim ited Over tensioned belts will shorten the belt and bearing life Damaged stretched or excessively worn belts should be replaced with a new matched set To tension belts loos...

Page 14: ...3 Remove 4 3 8th 24 x 1 1 2 HH bolts washers and lock nuts from each bearing and set aside Check to see if bearings have factory installation shims If so note the placement 4 Install new bearings placing the factory shims in there original position Note Make sure to reinstall the dust shields with the new bearings 5 When assembly is complete slide the shaft through both bearings If it doesn t slid...

Page 15: ...edule Gasoline Models Only Follow Engine Manufacturer s Maintenance Schedule Before each Operation Daily Every 4 Hours Every 40 50 Hours of Operation As Required Visually Inspect Entire Machine and Hardware X Check Engine Oil X Cutter Shaft Wear bushing drum X Grease Cutter Assembly Bearings X Clean Air Filter Element X Clean Dust and Dirt Off Machine X Check Hydrostatic Transmission Fluid Level X...

Page 16: ...nly qualified personal should work on live systems Yellow background with black pictogram and black outline This symbol means hazardous pressures are present Caution should be exercised to prevent personal injury or damage to equipment Face eye and head protection should be used Yellow background with black pictogram and black outline This symbol means explosive and hazardous vapors are present Ca...

Page 17: ...pment Blue background with white pictogram This symbol means that proper breathing protection or engineering controls must be worn used during the operation of this equipment there is a potential risk of operator lung damage Repeated and or substantial inhalation of airborne crystalline silica can cause serious or fatal respiratory diseases including silicosis In addition to California and some ot...

Page 18: ...anufacturers suppliers OSHA NIOSH and occupa tional and trade associations Water should be used for dust suppression when wet grinding cutting drilling is feasible When the hazards from inhalation of dust mists and fumes cannot be eliminated the operator and any bystanders should always wear a respirator approved by NIOSH MSHA for the material being used Grinding cutting drilling of masonry concre...

Page 19: ...the sale or use of the Products now or hereafter imposed together with all penalties and expenses Purchaser shall be responsible for collecting and or paying any and all such taxes whether or not they are stated in any invoice for the Products Unless otherwise specified herein all prices are exclusive of inland transportation freight insurance and other costs and expenses relating to the shipment ...

Page 20: ...CO INC SURFACE PREPARATION RESTORATION PROFESSIONAL SAWING EQUIPMENT HAND HELD TOOLS 100 THOMAS JOHNSON DRIVE FREDERICK MD 21702 PHONE 800 638 3326 OR 301 663 1600 Fax 800 447 3326 or 301 663 1607 Email sales edcoinc com Website edcoinc com Patents Pending Issued Created 6 2014 Printed in USA 2014 ...

Reviews: